Hydro Smart HS120CON-LP 120K BTU Condensing Gas LP Microboiler

Installation Manual and Owner’s Guide - Page 19

For HS120CON-LP. Also, The document are for others Hydro Smart models: HS120CON-NG

PDF File Manual, 60 pages, Read Online | Download pdf file

HS120CON-LP photo
Loading ...
Loading ...
Loading ...
Installation Manual
Page
19
Installation - Venting
Exhaust and/or direct-vent sidewall terminations should
be at least 2 ft. (610 mm) away from an opposite surface
/ wall. Do not place the termination directly in front of an
opening into a building.
A: Exhaust terminations must be at least 1 ft. (305 mm) away from any obstructions.
B: Intake terminations must be at least 1 ft. (305 mm) away from any obstructions.
Please follow all local and national codes in regards to proper termination
clearances. In the absence of such codes, the clearances above can be used
as guidelines. Local codes supersede these guidelines.
-For rooftop terminations-
Exhaust
.(610 mm)
min
Intake air
B
B
A
Exhaust
Gas
Intake air
Exhaust gas
B
A
CAUTION
Loading ...
Loading ...
Loading ...