Hydro Smart HS120CON-LP 120K BTU Condensing Gas LP Microboiler

Installation Manual and Owner’s Guide - Page 13

For HS120CON-LP. Also, The document are for others Hydro Smart models: HS120CON-NG

PDF File Manual, 60 pages, Read Online | Download pdf file

HS120CON-LP photo
Loading ...
Loading ...
Loading ...
Installation Manual
Page
13
Installation - Venting
-Intake and Exhaust Venting Illustrations-
2 inch venting installation
Typical installations using ABS, PVC, CPVC, or Polypropylene vent
Vent connections for single pipe
Single pipe with room-air intake
For details of the optional items, refer to "OPTIONAL ITEMS" section beginning on page 34.
Refer to "-Vent termination clearances-" section beginning on page 17 for
clearance information
1. Connect a 3" elbow directly on the intake vent collar of
the micro-boiler.
2. Connect a 3" x 2" reducer directly on the exhaust vent
collar of the micro-boiler. Make sure the couplings
engage the o-rings installed in the intake and exhaust
vent collars.
3. Connect a 2" straight pipe to the reducer.
* The micro-boiler came with a metal screen that
will t into a 3 inch elbow.
Hanger
* 3" elbow with bird
screen
Intake vent
collar
(Female)
3"x2" reducer
2" straight pipe
Exhaust vent
collar (Female)
Loading ...
Loading ...
Loading ...