8.3.2 Shield Construction Rules
Adhesives used in shield construction must not ignite or lose its adhesive qualities at temperatures
likely to be encountered.
Mounting hardware which extends from the shield surface into combustibles may be used only at
the edges of the shield.
Mounting hardware must allow full vertical ventilation.
See figures on next page for shield construction to match each letter to a clearance.
A) Minimum clearance between the appliance top and an unshielded combustible ceiling: (49 ¾")
(1245 mm) .
B) Shield extension above the appliance: 20" (500 mm).
C) Minimum space behind the shield: 1" (25 mm). In Canada " (21 mm).
D) Clearance along the bottom of the shield: minimum 1" (25 mm) and maximum 3" (75 mm).
E) Minimum clearance along the top of the shield at the ceiling: 3" (75 mm).
F) Mounting hardware must not be located closer than 8" (200 mm) from the vertical centre line of
the appliance.
G) Edge clearance for ceiling shields to side and back walls: 3" (75 mm).
H) Shield extension beyond each side of the appliance: 18" (450 mm).