User Manual - Page 47

For AR210 2020 LBT1050A-V. Also, The document are for others Yamaha models: AR210, SX210 212X, 212S, 212

Loading ...
Loading ...
Loading ...
Control function operation
39
1 ON position (green)
2 OFF position (red)
Battery switches (212X / 212S / 212)
The batteries and switch assembly are locat-
ed in the rear underseat storage compart-
ment (port).
This boat uses two marine batteries. One bat-
tery is designated as the start battery. The
start battery is connected to the starter cir-
cuits on both engines to provide current for
the starter motors.
The other battery is designated as the house
battery. The house battery provides power
for the various accessory circuits on the boat,
such as the circuits for lighting, bilge pump,
blowers and audio system.
1 Battery switch assembly
2 Start battery
3 House battery
There are three switches on the battery
switch assembly: the “START” switch,
“HOUSE” switch, and “EMERG PARALLEL”
switch.
1 “HOUSE” switch (red)
2 “EMERG PARALLEL” switch (yellow)
3 “START” switch (red)
1 ON position (green)
2 OFF position (red)
In normal operation, keep the “START” and
“HOUSE” switches in the ON position. Keep
the “EMERG PARALLEL” switch in the OFF
position. This setting allows both batteries to
be charged automatically while the engines
are running. NOTICE: Do not turn the
“HOUSE” switch to the OFF position if the
boat is moored in the water as it will pre-
vent the anchor light from functioning.
1 2
1
2 3
21
3
1 2
SportsBoat_F3R13.book Page 39 Friday, May 31, 2019 9:42 AM
Loading ...
Loading ...
Loading ...