Loading ...
Loading ...
Loading ...
49-1000469 Rev. 1 7
ENGLISH
BEFORE YOU BEGIN
Read these instructions completely and carefully.
IMPORTANT Observe all governing codes
and ordinances. Save these instructions for local
inspector’s use.
Note to Installer – Be sure to leave these instructions with
the Consumer.
Note to Consumer – Keep these instructions for future
reference.
Skill level – Installation of this appliance requires basic
mechanical skills.
Completion time – Refrigerator Installation - 20 minutes
Water Line Installation - 30 minutes
Proper installation is the responsibility of the installer.
Product failure due to improper installation is not covered
under the Warranty.
PREPARATION
MOVING THE REFRIGERATOR INDOORS
If the refrigerator will not fit through a doorway, the
refrigerator door and freezer drawer or door can be
removed.
To remove the refrigerator door, see Removing Doors in
the Installation Instructions section.
To remove the freezer drawer, see Freezer Drawer in the
Installation Instructions section.
WATER SUPPLY TO THE ICEMAKER AND DISPENSER
The icemaker will have to be connected to a cold water line.
A water supply kit (containing tubing, shutoff valve, fittings
and instructions) is available at extra cost from your dealer,
by visiting our website at Haierappliances.com or from Parts
and Accessories, 877.337.3639 (in Canada, GEAppliances.ca
or 800.661.1616).
TOOLS YOU MAY NEED
INSTALLATION INSTRUCTIONS
Adjustable Wrench
1/4” Outer Diameter
Compression Nut
and Ferrule (sleeve)
(icemaker models only)
Phillips-Head Screwdriver
and rĔSocket
Ratchet/Driver
3/32”, 1/8” & 3/16” Allen
Wrenches
Pencil
1/8” Drill Bit and
Electric or Hand Drill
Tape Measure
1/4” Nut Driver
Wire Cutters
Level
Torx T20, Driver
Loading ...
Loading ...
Loading ...