Report No. 141015030GZU-001
Sinsion Technology Industrial Co., Ltd
Page 31 of 33
Issued: 8-Jan-2015
Revised: None
Product Test Volta
g
e Test Time
All products covered by this Report. 1000V 60 s
or
1240V 1 s
The test equipment shall incorporate a voltmeter in the output circuit to indicate directly the applied test potential
if the rated output of the test equipment is less than 500VA.
If the rated output of the test equipment is 500VA or more, the applied test potential may be indicated by either:
1 - a voltmeter in the primary circuit;
2 - a selector switch marked to indicate the test potential; or
3 - a marking in a readily visible location to indicate the test potential for test equipment having a single test
potential output.
In cases 2 and 3, the test equipment shall include a lamp or other visual means to indicate that the test potential
is present at the test equipment output. All test equipment shall be maintained in current calibration.
The test shall be conducted on products, which are fully assembled. Prior to applying the test potential, all
switches, contractors, relays, etc., should be closed so that all primary circuits are energized by the test potential.
If all primary circuits cannot be tested at one time, then separate applications of the test potential shall be made.
The test voltage specified below shall be applied between primary circuits and accessible dead-metal parts. The
test voltage may be gradually increased to the specified value but must be maintained at the specified value for
one second or one minute as required.
Test Equipment
11.1 Dielectric Voltage Withstand Test
Method
One hundred percent of production of the products covered by this Report shall be subjected to a routine
production line dielectric withstand test.
Products Requiring Dielectric Voltage Withstand Test:
The test equipment shall incorporate a transformer with an essentially sinusoidal output, a means to indicate the
applied test potential, and an audible and/or visual indicator of dielectric breakdown.
- Dielectric Voltage Withstand Test
- Polarization Test
11.0 Manufacturing and Production Tests
The manufacturer agrees to conduct the following Manufacturing and Production Tests as specified:
Required Tests
ED 16.3.15 (1-Jan-13) Mandatory