Loading ...
Loading ...
Loading ...
17. Thread cable end through the jam nut and into the rod end bearing a minimum of 12mm.
Item Description Qty.
1 Rod End Bearing 1
2 Nut, M10 Hex Jam 1
3 Cable, 62" (1575mm) 1
18. Install screw, washers, and locknut securing the bushings and rod end bearing to the pulley bracket assembly using an 8mm Allen
wrench and a 17mm wrench.
Item Description Qty.
1 Rod End Bearing 1
2 Screw, M10 x 1.5, 80 mm 1
3 Washer, Flat 3/8" 2
4 Bushing, .969" 2
5 Nut, M10 x 1.5, Hex Nylock 1
Tighten hardware to 20-25  (27.1-33.9 Nm).
19. Select either the LBS or KG weight stack label. Remove backing from label and apply to weight stack.
NOTE: One weight stack label sheet, LBS or KG, is used for both weight stacks.
Item Description Qty.
1 Weight Stack Label 1
2 Weight Stack 1
20. Test the tower assembly.
Page 21 of 34
Loading ...
Loading ...
Loading ...