Loading ...
Loading ...
Loading ...
P/N 750301 Page 14
INSTALLATION OF YOUR PRO LINE SERIES HOOD BLOWER
INSTALLATION OF BS-IBPL600 INTERNAL BLOWER KIT
REFER TO WIRING DIAGRAM
1. REMOVE SHIPPING BRACKET (SEE ITEM 1)FROM HOOD. DO NOT DISCARD SCREWS!
2. INSTALL BLOWER BRACKET WITH THE SCREWS REMOVED FROM THE SHIPPING
BRACKET.
3. LOCATE THE TERMINAL BLOCK INSIDE THE ELECTRICAL SUPPLY BOX.
4. CONNECT FAN # 1 WIRE TO TERMINAL BLOCK #4.
5. CONNECT FAN # 1 WIRE TO TERMINAL BLOCK #6.
6. CONNECT THE 115 VOLT SUPPLY WIRE TO TERMINAL BLOCK #2.
7. CONNECT THE 115 VOLT SUPPLY WIRE TO TERMINAL BLOCK #1.
INSTALLATION OF BS-IBPL1200 INTERNAL BLOWER KIT
REFER TO WIRING DIAGRAM
1. REMOVE SHIPPING BRACKET FROM HOOD. DO NOT DISCARD SCREWS!
FOR FAN #1
1. INSTALL BLOWER BRACKET WITH THE SCREWS REMOVED FROM THE SHIPPING
BRACKET.
2. LOCATE THE TERMINAL BLOCK INSIDE THE ELECTRICAL SUPPLY BOX.
3. CONNECT FAN # 1 WIRE TO TERMINAL BLOCK #4.
4. CONNECT FAN # 1 WIRE TO TERMINAL BLOCK #6.
5. CONNECT THE 115 VOLT SUPPLY WIRE TO TERMINAL BLOCK #2.
6. CONNECT THE 115 VOLT SUPPLY WIRE TO TERMINAL BLOCK #1.
FOR FAN #2
CONNECT FAN #2 WIRE TO TERMINAL BLOCK #3.
1. CONNECT FAN #2 WIRE TO TERMINAL BLOCK #5.
Item 1: shipping bracket should be used with remote blower, as the attachment for the flue. Once
removed attach blower as described above.
Shipping bracket
Blower motor bracket
Loading ...
Loading ...
Loading ...