LG Electronics PQCPA11A0E

User Manual - Page 129

For PQCPA11A0E.

PDF File Manual, 163 pages, Download pdf file

Loading ...
Loading ...
Loading ...
Installation/Owner's Manual
3-47
3. ACP operation by using the LG ACCS
Operation switching period
It displays the period for stopping the peak operation. For example, if it is set to 5
minutes period, the air conditioners with the peak operation are switched every 5
minutes, which controls the time for all air conditioners to stop constantly.
The operation switching period can be controlled within the range of 5~15 minutes.
Setting the current operation status and the power control (graph)
The graph for displaying the current operation status and
setting the power control function is displayed at the left
side of the peak operation ratio control screen. The operator
can use this graph to check the power when all current
installed air conditioners operate 100% and to set the target
power.
In order to change the peak operation ratio, drag to set
the target power.
2
Note: Changing the peak operation ratio
In order to change the peak operation ratio, except the method using , it can be set by the
number input method described at the following section.
Loading ...
Loading ...
Loading ...