Installation
16 Outside Unit
Installation
Foundation for Installation
If it is necessary to prevent the unit from falling over, install as shown in the figure.
• Prepare all 4 wires as indicated in the drawing
• Unscrew the top plate at the 4 location indicated A and B
• Put the screws through the nooses and screw them back tight
A
B
C
Foundation bolt executing method
200 (7-7/8)
Nut
75 (3)
75 (3)
200 (7-7/8)
Spring washer
Frame
Anti-vibration
materials
Four bolt are
required
3 thread ridges
H-Beam
Concrete
base
100(3-15/16)
A : Location of the 2 fixation holes on
the front side of the unit
B : Location of the 2 fixation holes on
the rear side of the unit
C : wires
• Fix the unit tightly with bolts as shown below so that unit will not fall down due to earthquake or gust.
• Use the H-beam support as a base support
Noise and vibration may occur from the floor or wall since vibration is transferred through the installation part depending
on installation status. Thus, use anti-vibration materials (cushion pad) fully (The base pad shall be more than
200 mm (7-7/8 inch)).