Thinkpower TP20KTL Pv Gridconnected Inverter

User Manual - Page 22

For TP20KTL.

PDF File Manual, 56 pages, Download pdf file

Loading ...
Loading ...
Loading ...
Installation
Fig.3-8
Fig.3-7
4)Fix the back board to the wall using the tapping screws tightly.
7) The installation is finished
13
Installation
12
Tab.3-2: Effective spacing dimensions
Fig. 3-5
3.5 Inverter installation
3.5.1 Installation Guide
Fig. 3-6
Danger
1) Take out the back board and fix it to the wall; then peel the four logos
on the back board and attach them to the wall through the hole. Thus the
installation holes are marked.
Please check that the open circuit voltage, short circuit
current and maximum power at STC of the PV array are
within the capacity of the solar inverter.
The full load MPPT voltage range is within the
450V-800V.
2) Drill holes in the marked position as per the size of expansion screws.
3) Insert the expansion tubes into the hole, knock the tubes into the hole and
make them level with the wall surface.
5) Keep the inverter tilts slight upward, and attach it to the wall bracket slightly
to the top of its final position, and then visually check if the inverter is correctly
installed on the bayonet.
6) After installing the inverter, adjust the screw on the back of the box to
ensure that the inverter is parallel to the wall
.
Position Min.size(cm)
Front 20CM
40CM
40CM
50CM
Lateral
Top
Bottom
40mm40mm
40mm
40mm
50mm
50mm
3-9
Fig.3-9
Loading ...
Loading ...
Loading ...