Zephyr AK9352BS Monsoon II 54" Stainless Steel Hood Insert

User Manual - Page 28

For AK9352BS.

PDF File Manual, 72 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
28
Monsoon II Use, Care, and Installation Guide
MONSOON II
INSERT
PRO
ACT™ Conversion
Enabling ACT™
To enable ACT™:
1. Before hood installation, gain access to PC board by following the steps shown on FIG. I.
2. Change plastic jumper positioning as shown in FIG. J to set the desired maximum blower CFM.
3. Re-install PC board and continue with hood installation.
4. Remove the appropriate foil CFM sticker included with the hood literature and place inside the
hood body below the wiring diagram or in another clearly visible location.
To verify if your installer enabled ACT™:
1. With hood o, press and hold the power button for three seconds. If the number 6 displays =
defualt max. CFM, if the number 3 displays = max. 590 CFM, and if the number 2 displays = max.
390 CFM.
2. When ACT™ is enabled, the number of blower speeds will be reduced.
590 CFM = max. 3 speeds and 390 CFM = max. 2 speeds.
3. There should also be a foil label located inside the hood body near the wiring diagram that
indicates the blower CFM.
Loading ...
Loading ...
Loading ...