Zephyr AK9352BS Monsoon II 54" Stainless Steel Hood Insert

User Manual - Page 17

For AK9352BS.

PDF File Manual, 72 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
17
Monsoon II Use, Care, and Installation Guide
ZEPHYRONLINE.COM
Installation Instructions
Preparation & Installation
At least two installers are required due to the
weight and size of the liner.
CAUTION
1. Remove all packing materials and protective
film prior to installation. Use caution during
installation to prevent scratches or damage to
the stainless steel.
2. Cut out an opening in the bottom of the
cabinet by following the dimensions in FIG. B.
3. Prepare liner for installation into cabinet by
following the steps on page 18.
4. Lift liner into bottom opening of cabinet and
secure to interior of cabinet using (8) #8 x 1/2”
stainless steel screws; (4) screws in the front
and (4) screws in the sides. FIG. C.
34-1/2” or 40-1/2” or 46-1/2” or 52-1/2”
2
2
-
5/
8
cut o
u
t
(AK9334)
(AK9
340)
(AK9
352
)
(AK9
346)
1/4”
1-1/8
Make sure the surface you are securing the liner
to is capable of holding the weight of AK93.
Failure to do so may cause personal injury or
damage to cooking surface or counter.
WARNING
FIG. B
FIG. C
5. Finalize installation of electrical and duct work. Seal duct work with certified aluminum duct tape.
Power on liner, check for leaks around duct tape and verify proper operation.
NOTE: If access to top of liner is not available after installation, electrical and duct work connection
may need to be made prior to installing the liner.
6. Re-install the previously removed bottom panel, side spacer panels (if applicable), grease tray,
and bae filters.
Loading ...
Loading ...
Loading ...