Loading ...
Loading ...
Loading ...
Installation Requirements
Drain system requirements
1 Drain capable of eliminating 17 gaJs (64.3 L) per
minute.
2 A standpipe diameter of 1-1/4 in. (3.18 cm) minimum.
3 The standpipe height above the floor should be:
Minimum height: 33 in. (84 cm)
Maximum height: 96 in. (244 cm)
NOTE.........................................................................................................................
For installations requiring a longer drain hose, have
a qualified technician install hose P/N 134592700,
available from Sears Parts & Repair. Call 1-800-4-MY-
HOME. For drain systems in the floor, install a syphon
break kit available from Sears Parts & Repair. ....
g6 _
(244cm)
max.
T
33"
(84cm)
min.
,L
"l= "1
Exhaust system requirements
Use only 4 inch (102 mm) diameter rigid or flexible metal duct and approved
vent hood which has a swing-out damper(s) that open when the dryer is in
operation. When the dryer stops, the dampers automatically close to prevent
drafts and the entrance of insects and rodents. To avoid restricting the outlet,
maintain a minimum of 12 inches (30.5 cm) clearance between the vent hood
and the ground or any other obstruction.
Z_ WARNING
............. FiREHAZARD....
]]Failure to follow these instructions can create excessive drying times and fire
The following are specific requirements for proper and
safe operation of your laundry center.
FiRE HAZARD
Do not install a clothes dryer with flexible plastic or metal foil venting
materials. Flexible venting materials are known to collapse, be easily crushed
and trap lint. These conditions will obstruct clothes dryer airflow and increase
the risk of fire.
If your present system is made up of plastic duct or metal foil duct, replace it
with a rigid or semi-rigid metal duct. Also, ensure the present duct is free of any
lint prior to installing dryer duct.
incorrect
Loading ...
Loading ...
Loading ...