Spectra Watermakers CT-340R Catalina 340R

Product's Documents

Below are documents related to this product, you can read online or download:
User Manual Other Documents
  • Catalina 340R Fact Sheet - (English) Download
  • Plumbing Schematic CT340RM - (English) Download
User Service
  • Wiring Diagram CT 340R 12 24V - (English) Download
CT-340R photo

Catalina 340REM Remote Manual

This is the main product document for model CT-340R.

The file format is pdf, 75 pages, you can download this manual here .

background
Catalina 340R - Remote Manual
Installation and Operating Manual
Spectra Watermakers
Katadyn Desalination LLC.
2220 S. McDowell Blvd Ext. Petaluma, CA 94954
Phone: 415-526-2780 Fax: 415-526-2787
info@spectrawatermakers.com
www.spectrawatermakers.com
Updated January 2024
background
2
background
3
Spectra Product Registraon Form
(To be completed by end user/owner)
hps://spectrawarranty.formstack.com/forms/product_registraon
Spectra Watermakers Commissioning Report
(To be completed by authorized installer)
hps://spectrawarranty.formstack.com/forms/spectra_install_commissioning_report
Note: Oer & warranty criteria eecve 1/1/2021. For purchases made in the EU, please see ‘Expanded Warranty’
secon of warranty policy in back of the manual for EU specic coverage.
EXCITING EXTENDED WARRANTY OFFER!
-Upgrade the standard 1-YEAR manufacturer warranty to 2-YEARS and LIFETIME on Clark Pump.
Follow the below steps to submit for approval:
1. Have system installed & commissioned by Spectra Authorized FSP (full-service provider)
2. Fill out web-based Product Registraon form (see back of owner’s manual for paper copy)
3. Complete web-based install/commissioning form (see back of owner’s manual for paper copy)
4. Upon sasfactory review of required submissions, your 4-digit system serial number will
receive an extra year of warranty coverage, and lifeme coverage on the Clark Pump!
See ‘Extended Warranty’ secon of owner’s manual for full coverage details.
background
4
background
5
Thank you for your purchase of a Spectra Catalina 340R system. When properly installed and
maintained, it will provide years of trouble-free service. Professional installaon is strongly
recommended. Like any piece of mechanical equipment, the system will require inspecon
and service, so plan ahead for service access and install “service loops” in cabling. If a dealer is
installing the system for you, review the locaon of the components to ensure the installaon
will meet your approval upon compleon.
Catalina Installation Quick Start
Important Details for Installer
1. The system must have a dedicated sea water inlet to guarantee a constant ow of water to
the system. The inlet should be as low in the boat as possible with a dedicated, forward-facing
scoop-type thru-hull ng.
2. Both the Catalina 340R feed pump module and the Clark Pump/Membrane module must be
installed in a well venlated compartment where temperatures will not exceed 113°F (45°C).
Many engine compartments exceed this temperature when underway. Warranty will be void if
the installaon does not meet this requirement.
3. Follow the wire gauge charts in the instrucons! Using larger wire than specied is
acceptable.
4. If you are separang the Clark Pump/membrane assembly, please review the high pressure
tube assembly instrucons. Improper assembly will cause failure!
5. Run, test, then sea trial the complete system before assuming it is operaonal. If the boat is
in fresh or dirty water, see Dry Tesng the System. Aer tesng, make sure the ush cycle
operates properly. The water going overboard at the end of the ush should measure <1000
PPM Total Dissolved Solids.
6. The Spectra Remote Manual control must have DC power connuously to achieve the full
benets of the fresh water ush system. The domesc fresh water pressure must be on and
the fresh water tank level maintained. Calculate about 7 gallons (27 liters) per ush.
7. The Spectra Remote Manual must be de-powered (DC power o) aer the system is pickled
or winterized.
8. Spectra dealers are responsible for educang the vessel owners on the operaon and
maintenance of the system. Please walk through the enre installaon with our customer.
9. The equipment owner should ll out the warranty card or register online.
background
6
• Scan QR Code to Visit Spectra Manuals Page.
• Select System, then download the User Manual.
• Reference Commissioning Checklist for important
installaon requirements.
• Review Installaon Basics secon of Owner’s Manual
to ensure warranty compliance.
Spectra Watermakers - User Manual Online Access
hp://katadyngroup.ladesk.com/206595-Spectra-Manuals
background
7
Table of Contents
Geng Started .................................................................................................................... 9
Installaon Basics .............................................................................................................. 10
Components ...................................................................................................................... 11
Catalina Plumbing Schemac & Plumbing Detail .............................................................. 13
Product Water Plumbing and Pressure Gauge Tube Installaon ...................................... 15
Plumbing Detail ................................................................................................................. 18
Tube Fing Assembly Procedures .................................................................................... 20
Electrical ............................................................................................................................ 22
Installing A Remote Controller .......................................................................................... 25
Oponal Tank Switch Installaon ..................................................................................... 26
Operaon ...........................................................................................................................
New Systems Start Up and Tesng ................................................................................... 28
Dry Tesng with an Arcial Ocean .................................................................................. 29
Spectra Remote Manual Controller Guide ........................................................................ 30
Freshwater Flush Calibraon ............................................................................................. 31
Adjusng Fresh Water Flush Duraon .............................................................................. 32
Normal Operaon and Fresh Water Flush ........................................................................ 33
Nominal Operang Parameters ........................................................................................ 33
Maintenance, Storage, and Troubleshoong ..........................................................
Maintenance ...................................................................................................................... 34
Introducon to Spectra Chemicals .................................................................................... 38
Storage Procedures ........................................................................................................... 39
Winterizing with Propylene Glycol .................................................................................... 40
Membrane Cleaning Procedure ........................................................................................ 41
Suggested Spares ............................................................................................................... 42
Troubleshoong ................................................................................................................ 43
Catalina Flow Test.............................................................................................................. 46
Poor Water Quality ............................................................................................................ 48
Technical Bullens ............................................................................................................. 49
Spectra Remote Manual Controls ...............................................................................
Wiring Schemac ............................................................................................................... 52
Control Box Wiring ............................................................................................................ 54
Oponal Z-Ion Installaon and Instrucons ...................................................................... 55
Exploded Views and Part Numbers ........................................................................ 60
Owner Resources .............................................................................................................
Warranty, Product Registraon, Installaon & Commissioning Reports ......................... 69
background
8
background
9
Unpack the system and inspect it for damage during shipping. Freight damage must be
reported to the carrier within 24 hours.
Refer to the shipping list for your system to ensure you received all of the components listed.
Do not discard any packaging unl you have found and idened all of the parts. The small
installaon parts are listed on the kit list.
Study the system layout diagram, component photos, and descripons before beginning
installaon.
Lay out the system. Before starng the installaon idenfy where each module and
component will be placed. Ensure that there is enough clearance around the components for
removal of lters and system service. Make sure you have adequate tubing and hose before
starng. Addional parts may be ordered.
Getting Started
Catalina 340R Shipping List:
• Catalina Feed Pump Module
• 10% Clark Pump and Reverse Osmosis Membrane Module
• Boost Pump and Sea Strainer Module
• Fresh Water Flush Module or Oponal Z-Ion Upgrade
• Service Kit
• Remote Manual Controller
• 3/4-inch Black Spiral Sucon Hose (25 feet)
• 5/8-inch Vinyl Hose (25 feet)
• 3/4-inch Vinyl Hose (10 feet)
• 1/2-inch Vinyl Hose (25 feet) ed with Quick Connect Fing on
one end, and John Guest stem ng on the other end.
• 1/4-inch Black Product Tubing (25’)
We will not be held responsible for shortages that are not reported
within thirty days of the ship date.
WARNING
!
background
10
Thru-hull Location: The system must be connected to a dedicated 1/2” to 3/4” forward facing
scoop-type intake thru-hull and seacock.
Install the thru-hull intake as far below the waterline and as close to centerline as possible to
avoid contamination and air entering the system. Do not install the intake close to, or
downstream of, a head discharge, behind the keel, stabilizer fins, or other underwater fixtures.
Thru-hulls in the bow area are susceptible to air intake in rough conditions. Sharing a thru-hull
can introduce unforeseen problems such as intermittent flow restrictions, air bubbles,
contaminants, and will void the warranty. For racing boats and high speed boats traveling above
15 knots, a retractable snorkel-type thru-hull fitting is preferred because it picks up water away
from the hull.
The brine discharge thru-hull should be mounted above the waterline, along or just above the
boot stripe, to minimize water lift and back pressure.
Avoid restrictions or long runs on the entire inlet side of the plumbing from the thru-hull to the
feed pump module.
Secure the piping away from moving objects such as engine belts and hatches. Prevent chafe on
the tubing as required. Test and inspect all piping and hose clamps after several hours of
operation.
Pipe Fitting Instructions: To seal plastic-to-plastic fittings, wrap 6 to 8 layers of Teflon tape
over their threads. Hold the fitting in your left hand and tightly wrap the threads clockwise. For
smoother assembly, do not tape the first (starting) threads.
Wiring
• Pay attention to wire size or system performance will be impaired
• Perform wiring to UL, ABYC, CE or applicable standards
• Avoid tight hose bends and excessive runs.
• Use heavy gauge wire.
• Install feed pump module as low as possible.
• Use a dedicated thru-hull with scoop type
strainer.
Important Installation Notes
Seawater Flow
Thru-hull
Not Supplied.
Installation Basics
Avoid getting dirt or debris into the piping or hoses during assembly. A
small bit of debris can stop the system!
CAUTION
!
background
11
Components
Feed Pump Module
Mount the feed pump module on a vercal surface, up to 3-
feet (1.0M) above the waterline. It is preferable to mount as
low as possible. Locate in an area that allows easy access to the
lter, and the le hand side of the enclosure. Keep future
maintenance in mind when choosing a locaon, and do not
mount above water-sensive equipment. The feed pump has
overheat protecon and will not operate properly at
ambient temperatures over 113°F (48°C).
Sea Strainer and Boost Pump Module: Mount close to the
intake through-hull, below the waterline, in a locaon that
can handle water spillage during service. The boost pump
power cable will connect to the feed pump module.
Fresh Water Flush Module: The fresh water ush module may
be located in any convenient locaon near the feed pump
module. It should be mounted with the lter housing vercal
and accessible, with 2” of free space below the housing to
allow for lter changes. Do not install over electrical
equipment. The unit contains the charcoal lter, a solenoid
shut o valve, and a ush water ow regulator.
IF INSTALLING THE OPTIONAL Z±ION, SEE Z±ION
INSTALLATION INSTRUCTIONS FOR MORE DETAILS.
background
12
Double rubber mounts
to absorb vibration
This module must be installed in an area that maintains a temperature below 113°F (45°C). It
may be placed as high in the boat as you desire, and mounted in any position, even upside
down. Make sure that the area around and under the pump does not have any water sensitive
equipment, as water will be spilled during any repairs or if a leak occurs. Allow for easy access
to the pressure relief valve.
The Clark pump and membrane module comes complete with a mounting system. Be sure to
use the supplied washers on the rubber feet.
Pressure Relief Valve
Components - Cont.
Clark Pump and Membrane
Remote Manual Controller
The remote control panel can be mounted anywhere dry and
convenient. Cut a 5/8” (1.5 cm) wide by 5/8” (1.5 cm) high
opening for the display port. The display needs minimum 2
1/2” deep clearance for the cable. Take care not to damage the
plugs on the ends of the cable when routing.
background
13
Charcoal
filter
Freshwater Storage
tank
(Inside Boat)
(Outside Boat)
Feed
Water
Inlet
Feed
Pump Module
Brine discharge thru
hull (not included):
place above waterline
or tee into another
visible drain.
(Pressurized
Fresh Water)
Ocean Feedwater
Legend:
Drinkable Freshwater
Brine Discharge
Freshwater Flush
Note: Brine discharge hose may
be connected to either side of
Clark Pump
Use the supplied 5/8-inch
(15.9mm) clear braided vinyl
hose for all runs. More hose may
be ordered from Spectra, or
bought at a hardware or marine
store.
Simplified Plumbing Layout
Mount Controller in a dry location well above the waterline.
Flush water from ship’s
pressure water system 25
psi (2bar) minimum and
50 psi ( 3.5bar) maximum.
background
14
Installation Notes
background
15
Product output fitting.
(Back view of
instrument panel)
Use accumulator port to connect to the
pressure gauge with the supplied 1/4”
black nylon tubing. Tubing must be
pressure rated to 150 PSI (10 BAR).
Product Flow Meter
Pressure Gauge
Product Water Plumbing and Pressure Gauge Tube Installation
Product Sampling Valve: Mount using the
supplied plastic straps. Note: the handle points
in the direction of flow.
Product to tank: Route the product water
from the valve into the top of a vented
tank. Install a tee in the water fill or tap a
pipe thread into an inspection port.
DO NOT! feed the product into a
vent line, manifold, or the bottom
of the tank. Make sure that there is no
restriction in this piping. Pressure in the
product tubing must never exceed 5psi
(.3bar), running or stopped, or the
membrane will be permanently damaged.
Sampling Tap for testing
the product water.
Use the supplied 1/4” blue
tubing for the product
water plumbing.
!
background
16
Product Water
Feed Pressure Gauge
Product Water
Flowmeter
To Sampling Tap (Test TDS)
To Freshwater Tank Storage
OR
Black 1/4” Tubing
for Feed Pressure
Blue 1/4” Product
Water Tubing
Product Water Plumbing and Pressure Gauge Tube Orientation
Note: The orientation of subassemblies shown above are not to scale and installation will vary from
vessel to vessel. Ensure that tube runs are set up in this orientation, although length of runs will vary
based on where the Clark Pump and High Pressure Module are mounted in relation to the other
sub-assemblies.
The black 1/4” tubing runs from the accumulator to the Feed Pressure Gauge. Locate an optimal location close to the Clark
Pump for viewing and mounting the Product Water Flowmeter & Feed Pressure Gauge Panel and then cut the provided
black 1/4” tubing accordingly.
Take careful consideration where to mount the Product Sampling Valve so that the blue 1/4” product water tubing can
reach from the High Pressure Vessel to the Product Water Flowmeter, then to the Product Sampling Valve, and then
splitting off to the Sampling Tap to test the Total Dissolved Solids (TDS) in the product Water, as well as the Freshwater
Storage/Flush Tank.
High Pressure Vessel
background
17
background
18
Plumbing Detail
Your system includes 25-feet of 1/2” vinyl hose with a Quick
Connect ng on one end and a 1/2” John Guest stem ng
on the other, both crimped on with ferrules. You will CUT THIS
HOSE and, using the ngs found in the installaon kit, use
one end for the feed water inlet hose and the other for the
fresh water ush hose:
Fresh Water Flush: Route a feed line from the domesc cold pressure water system to the
1/2” hose barb on the fresh water ush module. This needs to be pressurized for the fresh
water ush system to funcon properly. The domesc fresh water pump must be able to
deliver 1.5 gallons per minute (6 LPM) at 25 PSI (1.7 bar). Note: Never leave system
unaended during a ush cycle. Once cycle is complete system will sll draw power in a
standby state unl user manually pushes the ‘Stop’ buon on the controller.
Aaching 1/2” vinyl hose to Z-Ion/
fresh water ush module with the pre-
ed Quick Connect ng:
From the intake seacock to the sea strainer/boost pump module,
and from the sea strainer/boost pump module to the prelter
housing on the feed pump module, use the 3/4” black, spiral-
wound sucon hose:
Flush water from ship’s
pressure water system
25 psi (2bar) minimum
If purchased, the oponal
Z-ION replaces the Fresh
Water Flush Module
Aaching 1/2” vinyl hose to sea
strainer using the 3/8” John Guest
stem ng and hose
clamp found in
installaon kit:
background
19
Quick Disconnect Fing
Plumbing Detail - Cont.
Brine Discharge: Route the brine discharge from the quick disconnect ngs to a thru-hull
above the waterline using the supplied 5/8” braided vinyl hose and the male Quick Disconnect
ng from the installaon kit:
From the feed pump to the Clark Pump feed water inlet, use the remaining 1/2-inch vinyl hose,
with the 1/2-inch John Guest stem ng pre-ed with a ferrule. Insert the pre-ed end into
the feed pump (Figure 1), and the 1/2” John Guest stem ng and hose clamp from the
installaon kit for the Clark Pump feed water inlet (Figure 2). Refer to John Guest assembly
instrucons on page 18:
Figure 1: Figure 2:
background
20
background
21
John Guest Super Speedfit Fittings
background
22
Catalina 340R systems are pre-fitted with waterproof connectors for electrical and signal cables.
Each connector is different, so it is impossible to connect them incorrectly, and the connectors
are color-coded. The system has a power inlet harness with a terminal block and cover, a 2-
conductor boost pump cable, a 2–conductor fresh water flush solenoid cable, a Z-Ion power and
signal cable, and a 25-foot (7.62M) cable for the Remote Manual Controller.
The Catalina 340R has a power inlet harness with a terminal block and cover, a boost pump
power plug with a yellow band, terminal block for the tank full switch and the oponal tank
level sensor, and a short plug with a green band for the oponal Z-Ion.
Do not install it in hot or poorly venlated locaons. Allow access to the motor speed
control.
Electrical
Run Auto/Manual/Service
toggle switch
Motor speed controller
Spectra Remote Manual
Circuit Board (Inside
control box)
Z-Ion power and signal
cable (3-conductor, Green)
Cables are shown coming
out of the boom of the
Feed Pump Module.
Fresh water ush solenoid
cable (2-conductor, Blue)
background
23
Electrical - Cont.
Wire Size Guide for the Catalina 340R 12 Volt:
8 Gauge (10mm²) up to 15 feet (4.5M)
6 Gauge (16mm²) up to 20 feet (7.6M)
4 Gauge (25mm²) up to 35 feet (14M)
Note: All wiring to be done to applicable ABYC,
Marine UL, or CE standards.
Distances at le represent the total
ROUND TRIP wire length (DC posive
length plus DC negave length), NOT
the length of the pair of wires
together. Size cables accordingly.
Mount the main power terminal block in a juncon box or on a bulkhead adjacent to the feed
pump module. Make sure that this is a dry locaon well above bilge level and not subject to
water spray. Be sure to install the terminal block cover.
Check the wire size chart for appropriate wire sizes. DC power feeds should be uninterrupble
to insure proper operaon of the auto store feature. Avoid house breaker panels that could be
accidentally tripped.
Component Sizing:
• 12-Volt: Use a 32A-35A breaker and size the wiring for 25 Amperes.
• 24-Volt: Use a 15A breaker and size the wire for 13 Amperes.
• Provide circuit protecon at the source! Undersized wiring will reduce system
performance.
Connect the yellow boost pump connector from the boom of the feed pump housing to
the corresponding connector routed from the boost pump.
background
24
Electrical - Cont.
The Catalina 340R has one port that
can be viewed when looking down
inside the Feed Pump Module. This
port is labeled ‘Display’ but is
actually for the Remote Manual
Controller. The Remote Controller
cable is a standard Cat 5e ethernet
cable.
25’ (7.62M) cable with
connectors for the Remote
Manual Controller
background
25
Installing a Remote Controller
Route the cable through the vessel in the most direct route possible. Avoid kinking the wire,
or sharp corners where the wire can chafe through while the vessel is under way.
Turn power OFF to the system.
Connect the ethernet cable to back of the display in the open jack.
Connect the opposing end of the ethernet cable to the RJ45 port labeled “DISPLAY” in the feed
pump module.
Remote Controller Plugin
background
26
Watermakers should never be run unaended.
Tank Full
If a tank switch has been installed, the
“Running” and “Stopped” lights will be
illuminated when the tank is full and the
system will stop.
Your watermaker should never be left running unattended.
WARNING
!
Optional Tank Switch
The customer supplied oat switch must be connected to the Terminals 5 & 6 labeled Tank
Full within the Control Box that is mounted to the inside of the Feed Pump Module. There is
no polarity. Remove the jumper. Connect the wires to the terminals.
Use 18/2 nned wire or larger. Wire is not included in the installaon kit.
Connect to
Terminals 5 & 6
Note: Remove only the jumper in terminals 5 & 6.
OR
Top-Mounted Side-Mounted
background
27
Customer-Sourced Tank Full Switch
Installing an oponal tank full oat switch at the top or the side of your water
tank allows the watermaker to ll your ship’s water tank then automacally
stop running. The user can then fresh water ush the system by hing ’Stop’
and then ’FWF’ on the Remote Controller.
Your watermaker does not come with the top-mounted Tank Full Switch
(EL-SWT-LV). However, this part can easily be sourced from your local
dealer or Full Service Provider if you wish for your system to
automacally stop once your freshwater tank is full.
If you do not install the Tank Full switch in your tank, you MUST
MANUALLY STOP the system when your freshwater tank has been lled. The system will not
stop automacally.
Note: The oat may need to be ipped 180 degrees to work properly. Many oats can be
easily ipped by removing the clip opposite the wire.
Optional Tank Switch - Cont.
Drill and Tap
Drill and tap a 1/8” NPT port into the top of the fresh water tank if using a top-mounted oat
switch or into the side of the tank if using a side-mounted oat switch. A top-mounted oat
can be installed on a tank access cover, or directly into the water tank. If installing on an
access cover, be sure to leave a service loop on the oat switch wiring to allow removal of the
tank access cover.
background
28
New System Start-Up and Testing
Avoid running the Catalina system if the vessel is in contaminated water. The system should be fully tested before leaving port.
If the location or weather prevents proper testing, refer to Dry Testing with an Artificial Ocean on page 29.
Every new system is shipped from the factory with nontoxic, food-grade propylene glycol. Propylene glycol,
Spectra Chemicals, or anything other than seawater or freshwater must be purged from the system with the
pressure relief valve open at least 1/2 turn. You can purge your system with seawater or with freshwater via the
system’s freshwater flush function. The system must be purged for a minimum of 60 minutes, or until at least 40
gallons of water have moved through the system.
***When purging SC-1 from a pickled watermaker, system must be purged for a minimum of 20
minutes. Propylene Glycol should be purged for minimum 60 minutes***
Warning! Damage may occur if the purge sequence is bypassed
and the membrane is pressurized with storage chemical in it.
1. First, check that:
• Thru-hull inlet and the brine discharge valves are open.
• All of your hose connections are tight.
• The washer with the green tag under the pressure relief valve has been removed.
• The pressure relief valve is open at least 1/2 turn.
• The sampling valve is set to the sample position
• The brine line is able to freely discharge
3. Run the system without pressure for 60 minutes to purge the storage
chemicals. The pressure gauge should read less than 35 PSI. If purging with
freshwater, the sampling tube may discharge water.
4. Close the pressure relief valve. The pressure should rise to 60-80 PSI (4.2-5.7bar) on a
Catalina 340R. Water should begin to flow out of the sampling tube. If the ship is located in
brackish or fresh water, the pressure will be lower.
Depending on storage and environmental conditions the system may need to have additional
purging time. If the product water does not taste pure or sample at below 500 ppm, purge or run
the system with the pressure relief valve open for up to 6 additional hours.
Open 1/2 Turn when
purging chemicals!
Remove Tag and Washer!
For a purge with seawater
• Move to an area free of contaminated water.
Avoid areas such as polluted harbors or canals.
For a purge using the freshwater flush
• The vessel’s pressurized water system
is on
3-Way Sampling Valve
2. Turn on feed pump via the manual toggle switch and check to
make sure water is coming out of the brine discharge (thru-hull
above water).
To Sample
To Tanks
In
background
29
Dry Testing with an Artificial Ocean
If it is not possible to test run the system with the boat in the water, you may test the system with
an artificial ocean. You will need 1.3 lbs. of non-iodized salt (rock salt, sea salt, or aquarium salt)
to make a 5 gallons (33 grams of salt per liter) of water that is about 33,000 PPM salinity (average
seawater salinity). Make sure the domestic water system is powered up and the boat’s tank has at
least 60 gallons (230 Liters) of water to purge the storage chemicals from the system. Confirm
that the charcoal filter is installed in the feed pump module, and the domestic water line is
connected.
1. Open the pressure relief valve on the Clark Pump. Remove the green tag and spacer.
2. Press the Fresh Water Flush (FWF) button to run a full flush cycle. Do this six times to
purge the storage chemicals, a 36 minute process.
3. Replace the brine overboard hose with the brine service hose per Figure 3.
4. Push the Fresh Water Flush (FWF) button again to fill the bucket with fresh water from the
brine discharge service hose (hose attached to Clark Pump). Press Stop when the bucket is
full.
5. Mix the salt to the proper proportion or use an aquarium hydrometer to adjust the salinity level
to a specific gravity of 1.025.
6. Disconnect the quick release fitting from the pigtail coming from the charcoal filter housing
outlet and connect the intake service hose per Figures 4. Route both service hoses into a 5
gallon (20 liter) bucket. Disconnect the product tube from the diversion valve manifold, and
using another small piece of tube, route it into the bucket.
7. Push the Start button, allow the system to prime, and then close the pressure relief valve. The
system should build pressure shortly and start making water, with the brine and product water
recombining in the bucket to be cycled again. This will gradually heat the water. Do not let the
water temperature exceed 120 deg. F (49 deg. C). Run the system for roughly 45 minutes of
operation.
8. While the system is running pressurized, check for proper operation and leaks. After testing
the system, re-install the brine discharge hose, product tube, and fresh water hose from the
strainer. You can now flush the system by pressing the Fresh Water Flush button.
Remove tag
and washer
OPEN PRESSURE
RELIEF VALVE
Fig. 3
Fig. 4
Fig. 1
Fig. 2
background
30
Start
Pressing the ‘Start’ buon begins watermaker
operaon.
If the system has been pickled, winterized, this is the rst startup, or the condion of the system is
unknown, go to NEW SYSTEM START-UP on page 28 or serious damage may occur.
A fresh water ush should be performed aer every use of the watermaker. The system will need
to run for approximately half an hour to make enough fresh water for one ush.
Fresh Water Flush (FWF)
Pressing the ‘Fresh Water Flush’ (FWF) buon
oods the watermaker with fresh water from the
vessel’s domesc water tanks. Opens solenoid
valve to allow water to ow from tank instead of
seawater from the thru-hull. Fresh Water Flush
mode will end automacally aer ush is
complete, approximately 3 minutes.
Stop
Pressing the “Stop” buon ends watermaker opera-
on. The “Stop” buon must be pressed before
beginning a Fresh Water Flush.
Fault Light
The “Fault” light indicates that there is a
problem with the system. This relates to a high
pressure or boost pressure fault, read by the
vacuum switches aached to vane pump.
Spectra Manual Remote Controller Guide
background
31
Flush Adjustments
Adjustments for your Catalina 340R are typically calibrated from the factory to ensure that sea
water is thoroughly ushed out of the watermaker using the least amount of fresh water.
However, due to dierent lengths of hose runs, dierent rates of ow, and dierent pressures
in shipboard fresh water systems, the ush duraon should be opmized for your boat. The
ush cycle is adjusted with 2 sengs: the pump speed and the ush duraon.
Check the pump speed
1. Close the thru-hull for the raw water inlet.
2. Push the Fresh Water Flush (FWF) buon. The ush valve will open and the feed pump will
start at Flush Speed. If the ush completes normally, then the Flush Cycle is set properly.
Slowing down the pump during a Fresh Water Flush
Inside the feed pump module, next to the Control Box, is the pump speed controller. On the
speed controller board are two magnec reed switches for adjusng
the pump motor speed. The switches are narrow black bars,
5/8” (16mm) long. The increase speed switch is labeled S2; the
decrease speed switch is labeled S3. Each me a small magnet is
placed near the switch with the pump
is running, the speed will change slightly.
1. Open the thru-hull for the raw water inlet.
2. Push the Fresh Water Flush (FWF) buon.
3. Gently tap a magnet on the S3 Reed Switch (Decrease Speed
Switch). Wait 3 seconds between each pass of the magnet.
4. Gently tap the magnet 3 mes, then go back to step 3.
Once you’ve adjusted the speed correctly, the speed controller
will stay programmed for this speed during fresh water ushes.
Freshwater Flush Calibration
Increase
speed
switch
Decrease
Speed
switch
background
32
3. Check/Adjust the ush duraon
Run the watermaker for 10 minutes to ll the system with seawater, conrm that good
product water is being sent to the tanks.
Press the ‘Stop’ buon. The system will stop. Press the ‘FWF’ buon and the system will begin
ushing.
Allow the fresh water ush to connue to compleon. At the end of the ush cycle capture
some of the ush water at the brine discharge in a clean cup. Measure the salinity of the brine
discharge and conrm that it is below 1000ppm using a calibrated hand held TDS meter.
If the ush duraon needs to be increased, connue reading.
Adjusting Fresh Water Flush Duration
The Catalina Freshwater Flush Duraon is set to a factory default of 3 minutes, which is usually
the right amount of me to ensure that seawater is thoroughly ushed out of the watermaker
using the least amount of fresh water. However, due to dierent lengths of hose runs,
dierent rates of ow, and dierent pressures in shipboard fresh water systems, the ush
duraon can be opmized for your boat.
Set the Flush Duraon with a small screwdriver so that the fresh water ush comes to an end
just as the salinity of the brine discharge drops below 1000 PPM, or no longer tastes brackish.
Since the ush duraon can only be adjusted in round minutes, you may want to lessen the
duraon to 2 minutes, to save water, or increase to 4 or more minutes to ensure a thorough
ush.
Also, the charcoal lter is rated for 1.5 GPM (6 LPM): If the system pushes more than 1.5 GPM
through the charcoal lter
background
33
If the system has been pickled, stored, or contains cleaning compounds, use the New System Startup procedure.
The system should be fully run tested before you leave port. If the location or weather prevents proper testing refer to
“Testing with an Artificial Ocean.”
1. Check that the thru-hull inlet is open.
2. Turn the product sample valve to the SAMPLE position.
3. Turn the toggle switch on the feed pump module to RUN MANUAL.
4. Start the system by pushing ‘Start’ and check for flow by inspecting the brine discharge and checking
for pressure on your analogue gauge. If there is no flow, open the pressure relief valve on the Clark
Pump to prime the system and bleed the air out of the feed pump.
5. After 5 minutes, check the product water with your handheld salinity tester. When it is below 750 PPM,
divert the product into your tank by rotating the product sample valve handle 90 degrees.
6. Run the system until you have filled your tank or have made enough to meet your requirements.
7. Following your water making session, perform a freshwater flush.
Freshwater Flush (You should freshwater flush your watermaker after EVERY use.)
1. Push the Freshwater Flush button on the remote panel.
2. The freshwater flush solenoid will open and feed pump will come on, allowing pressurized freshwater
to flow through the system. Pressure will drop on the gauge, which indicates that the membrane is
flooded with fresh water.
3. After a proper flush, the ppm of the brine discharge should be below 1000ppm.
You may now leave the system unattended for up to five days (30 with the Z-Ion) without further attention.
Remember that you need to run the system almost a half an hour to make enough water for a flush. You
may notice that the system output is higher while charging your batteries, as the machine is voltage
sensitive.
Normal Operation and Fresh Water Flush
Analog Gauge Panel
Remote Panel
3-Way Product
Sampling Valve
To Sample
To Tanks
In
Nominal Operating Parameters
System
AMPS Feed Pressure Static * Total Flow/Feed Flow Product Flow
Product
Quality
12V MAX 24V MAX PSI bar PSI GPM LPM
GPM
(min)
LPM
(min)
GPH LPH
GPH
(min)
LPH
(min)
TDS
Catalina 340 19.5 21.5 9.75 10.75 90-100 6.3-7 25-35 2.8 10.6 2.7 10.2 14 52.9 13.5 51.0
< 300
For Spec Producon:
12V Systems: Run at 13.2 VDC min
24V Systems run at 26.4 VDC min
background
34
Maintenance
General
Periodically inspect the entire system for leakage and chafing. Repair any leaks as
soon as you find them. Some crystal formation around the Clark Pump blocks is
normal. Wipe down any salt encrusted areas with a damp cloth.
Watermakers are at their best when run regularly. Biological fouling in the membrane is more
likely when a watermaker sits idle. A warm environment will cause more growth than a cold
environment. A fresh water flush every five days will greatly reduce biological growth, but may
not stop it completely. The Z-Ion system protects the membrane from bio-fouling without the
use of storage chemicals and can be flushed every 30 days for maximum effectivity.
The Seawater Strainer
The seawater strainer’s stainless steel element should be inspected, removed, and cleaned as
needed. Ensure that the thru-hull is closed before disassembly and the gasket is in place before
reassembly. When the system is put into storage, remove the strainer, rinse with fresh water,
and reassemble dry to impede corrosion. Check frequently during operation.
Prefilter Assembly
Prelter elements must be changed frequently. The rate is solely dependent on the input water.
A 5-micron lter might last you a 4-6 weeks in clear open ocean seawater, or be ruined in
minutes in a dirty harbor. A vessel may be sailing through seemingly super clear water, but
cruise through a plankton bloom and the prelter will be ruined. Spectra does not advise to
aempt to clean dirty prelters. Prelters are a consumable item and should be changed for
new when in queson. Please review prelter bullen to page 50. prior to running your
system.
To service the lter close the thru-hull, open the prelter housing, remove the old lter, clean
out the housing bowl, and reassemble the housing with a new 5 micron lter element. Leave dry
unl next startup.
Note: Use only Spectra-approved lters or you may void your warranty. Occasionally, lightly
lubricate the O-rings with silicone grease.
Oil/Water Separator (Optional)
To install oil water separator capability, add a second lter housing UPSTREAM of the 20 and 5
micron housings. Service as you would per the instrucons above.
background
35
The Charcoal Fresh Water Flush Filter
Replace the charcoal filter element at least every 6 months. This filter protects the membrane
by removing chlorine from the flush water. Use only a Spectra-approved replacement.
The Feed Pump and Clark Pump
The feed pump and the Clark Pump require no routine maintenance except inspection for
leaks. Tighten any hose clamps or fittings that show signs of leakage. The high pressure fittings
threaded into the Clark Pump have O-ring seals with a straight thread. These should never leak
and should never be over-tightened. If one of the tube nuts starts to leak, it can be un-
threaded, sealed with a bit of silicone grease or oil, and tightened with two wrenches very
tightly.
The Membrane
Membranes are susceptible to mineral scaling, biofouling and oxidation damage. The leading
cause of fouling is biological growth that forms when the system is left unused without
flushing or pickling. Fouling from mineral scaling can happen under certain seawater
conditions, or from rust. Oxidation damage can occur if the membrane comes into contact
with any strong oxidant, such as Ozone, Chlorine, etc. Monitor the product salinity and feed
pressure for higher than normal readings, take environmental conditions into consideration.
Note:
• Cold feed water or a higher salinity seawater source can cause high pressure.
• Low product flow is usually due to low voltage, a worn feed pump, or worn Clark Pump.
Due to the unique design of your Spectra system, low product water volume is typically not a
membrane problem, but frequently related to low voltage, a worn feed pump head, or a worn
Clark Pump. Always perform a flow test before cleaning your membrane.
Test to see if biological growth has occurred: Before running the system, remove the
prelters and examine their condion. If the lter housings are full of smelly, discolored water,
the system was not properly stored. Install clean prelters.
Next check the membrane. Detach the brine discharge hose, aach the brine service hose, and
lead it to a bucket. Open the pressure relief valve 1/2 turn, and manually run the system for 30
seconds (metal toggle switch on feed pump module). Examine the brine water: If it is
discolored and smells bad, perform an SC-2 cleaning with unchlorinated water before running
the system pressurized. If the brine is fairly clean, follow the New System Startup procedure
on page 28 and run normally. Check for performance. Clean the membranes only if
performance is reduced.
See the Cleaning Procedure for complete instructions.
Maintenance - Cont.
background
36
Leaking Fings
The system has eight high pressure ngs, two on each cylinder on the Clark Pump, two on
the pressure vessel end caps, and two 90-degree elbows on the back of the Clark Pump. As the
compression ng is ghtened, it compresses a ferrule onto the stainless tubing, xing the
ferrule permanently to the tube and holding the compression nut capve.
The body of the ng seals to the underlying component with an O-ring. On the Clark Pump
cylinders and the end caps this O-ring is compressed by ghtening the enre ng. The O-
rings on the 90-degree ngs on the back of the Clark Pump have capve nuts and washers,
which compress the O-rings without turning the enre ng.
If a tube ng leaks it can somemes be resealed by just ghtening. You must use two
wrenches, a 13/16-inch wrench to hold the base, and a 7/8-inch wrench to turn the
compression nut. The 13/16-inch wrench will need to be thin so as not to interfere with the
compression nut. If this doesn’t work, disassemble the ng, grease liberally with silicone
grease (the ferrule and the threads) and re-ghten rmly.
The base O-rings should be gently compressed to achieve a good seal, and may be damaged
by overghtening.
Stainless Fitting Hex Nut
Connector O-RING
Nickel-Bronze High Pressure Elbow
Nickel-Bronze High Pressure Straight Fitting
Ferrule
Maintenance - Cont.
background
37
Introducon to Spectra Chemicals
We use four types of chemicals: SC-1, SC-2, SC-3, and propylene glycol anfreeze. SC-1 and
propylene glycol are for system storage, while SC-2 and SC-3 are for membrane cleaning. Do
not use sodium-bisulfate, citric acid, or any other storage chemical not supplied by Spectra.
These chemicals, used to store other watermaker brands, will damage the Clark Pump,
membrane end plugs, manifolds, and other components. Using non-Spectra chemicals will
void the warranty.
Note: Never use any chemicals with the system pressurized! Always open the pressure relief
valve 1/2 turn. Always follow the instrucons for purging the chemicals as shown in the New
System Startup secon (page 25).
Storage
SC-1 prevents biological growth when your system is idle. It should not be used as a cleaning
chemical, nor will it protect your system from freezing. A bag of SC-1 is mixed with 1 to 2
gallons of product or dechlorinated fresh water in a bucket and circulated through the system
for 10 minutes. This treatment will protect the system for six months, aer which the SC-1
treatment must be repeated. To use SC-1, follow the instrucons for Storage Procedure.
Spectra systems should be stored with propylene glycol if freezing is likely to occur. Propylene
glycol can be used instead of Spectra SC-1 storage chemical for storage in any climate, and
treatment is eecve for one year. Propylene glycol is a food-grade anfreeze used to
winterize RV’s, boats, and cabins. Do not use ethylene glycol automove anfreeze, which is
toxic and will damage the system.
The propylene glycol formulaons sold in marine and RV stores are usually diluted with water.
The water remaining in the watermaker before the storage procedure will further dilute the
anfreeze, reducing the microbial protecon and increasing the temperature at which the
mixture will freeze.
Anfreeze labeled “Minus Fiy” is a 25% soluon and will begin to form an icy slush at about
+15Degrees F (-10C) and will only provide burst protecon to about Zero F (-18C). Aer a
further 50% percent diluon by water remaining in the watermaker, “Minus Fiy” anfreeze
will only protect from bursng down to about +25F (-4C). Therefore if low temperature
freezing protecon is required a 60% or stronger anfreeze should be used. 60% soluons are
labeled “Minus 100” and will provide burst protecon to -15F (-27C) even aer a y percent
diluon with residual water. “Minus 200” formulaons are pure propylene glycol.
Maintenance - Cont.
background
38
Introducon to Spectra Chemicals - Cont.
Complete microbial protecon requires a 25% soluon of propylene glycol, so care must be
taken that the soluon remaining in the watermaker during long term storage is at least 25%,
even if freeze protecon is not required. For these reasons Spectra recommends that all
pickling be carried out with a 60% or greater concentraon.
See Winterizing with Propylene Glycol.
Propylene glycol can be dicult to ush from a membrane, especially aer extended storage
periods. This results in high salinity water (high PPM) and residual avor in the product water.
We recommend ushing the system WITH THE PRESSURE RELIEF VALVE OPEN for 4-6 hours
aer storage with propylene glycol—the longer the beer. If, aer extended ushing, you sll
experience low product water quality, cleaning with SC-2 usually removes all traces of
propylene glycol and returns the salinity to the level it was before storage with propylene
glycol. See the Membrane Cleaning Procedure.
Cleaners
Avoid unnecessary cleaning, and avoid cleaning as a diagnosc tool.
SC-2 is an alkaline cleaner used to remove light oil, grime and biological growth. It is most
eecve if heated to 120 deg. F (49 deg. C). In most cases the water quality will increase in
PPM (salinity) aer an SC-2 cleaning. Aer a few hours it should recover to near the level it
produced before the cleaning.
SC-3 is an acid cleaner used to remove mineral and scale deposits. In most cases this is used
rst and if there is no improvement, go on to the SC-2 cleaning. SC-3 will in most cases lower
the product PPM and overall pressures. Scaling is a slow process that may take several months
or years.
For cleaning with either SC-2 or SC-3, see Membrane Cleaning Procedure.
Maintenance - Cont.
background
39
Storage Procedure
1. Close the intake seacock.
2. Push the Fresh Water Flush (FWF) buon to fresh water ush the system. Perform a second
fresh water ush in the same way.
3. Remove the quick disconnect ng from the brine discharge outlet of the Clark Pump, per
photo below, and replace it with the quick disconnect brine discharge service hose. Lead the
brine service hose into the bucket.
4. Push the FWF buon and run the feed pump unl you have one gallon of fresh water in the
bucket from the brine discharge service hose, then press Stop.
5. Mix 1 container of SC-1 storage compound with the water in the bucket. It may not dissolve
completely, which is normal, and any undissolved parcles will be caught by the prelter.
6. Remove the hose from the “to strainer” pigtail on the feed pump module and install the inlet
service hose from the service kit, per photos below. Lead
this hose into the 5 gallon (20 liter) bucket as well.
7. Make sure the pressure relief valve on the Clark Pump is
OPEN (un-pressurized) by turning 1/2 turn
counterclockwise
8. Turn on the feed pump by moving the manual control
switch on the control box to ‘SERVICE’. The soluon will be
drawn from the bucket with the service hose, and
returned to the bucket from the brine discharge service
hose. Circulate the storage chemical in the system for
approximately 20 minutes. Stop the feed pump by moving the switch back to the ‘RUN
AUTO’ posion.
Clean Up
Remove the brine discharge service hose from the Clark Pump, and replace the brine discharge
hose that leads to the thru-hull. You may now pump the bucket dry by moving the manual
control switch on the Control Box back to ‘SERVICE’. Stop the feed pump by moving the switch
back to RUN AUTO.
Remove the inlet service hose and reaach the hose from the sea strainer to the “To Strainer”
pigtail on the manifold at the Feed Pump Module. Drain and clean the strainer and any lters in
the system. Reassemble dry. Leave the pressure relief valve open, since the next me you run
the system you will need to purge the storage chemicals with the system unpressurized. Turn o
the power to the system.
Connecng brine discharge
service hose
Aaching intake service hose to
the hose connecng to the sea
strainer.
Removing hose to sea strainer
from the “to strainer” pigtail.
background
40
Winterizing With Propylene Glycol
See descripon of propylene glycol formulaons, and purging from system.
1. Close the intake seacock.
2. Push the Fresh Water Flush (FWF) buon to fresh water ush the system. Perform a second
fresh water ush in the same way.
3. Remove the hose from the “To Strainer” pigtail, install the inlet service hose from the service
kit, and lead the hose to the boom of a bucket. Connect the brine service hose, and run it
into a second container.
4. Pour 1 gallon (4 liters) of propylene glycol of appropriate
concentraon (see pages 42-43) into the bucket with the
intake service hose.
5. Make sure the pressure relief valve on the Clark Pump is
OPEN 1/2 turn (un-pressurized).
6. Run the feed pump by switching the manual switch on the
control box to ‘SERVICE’ unl about a gallon of water has
owed from the brine discharge service hose, or anfreeze
appears. Propylene glycol will look slightly dierent, and
feel more slippery, than water. Stop the pump by moving
the switch back to ‘RUN AUTO’. Add more propylene glycol to the intake bucket if necessary.
7. Lead the brine discharge service hose into the intake bucket of propylene glycol. Move the
switch back to ‘SERVICE’. The service hose will now draw propylene glycol soluon from the
bucket, and the brine discharge service hose will return it. Run the feed pump and circulate
the propylene glycol for 20 minutes.
8. Stop the feed pump by switching the toggle switch back to ‘RUN AUTO’. Drain the seawater
strainer, the hose leading to the boost pump module, and the hose between the boost pump
module and the feed pump module. Disconnect the product tubing from the membrane
housing and blow residual water out of the tubing. Empty the charcoal lter housing and ush
water lines. Leave the pressure relief valve open, since the next me you run the system you
will need to purge the system unpressurized.
Your watermaker is now protected from freezing and biological growth and freezing for one year.
Connecng brine discharge
service hose
Removing hose to sea strainer
from the “to strainer” pigtail.
Aaching intake service hose to
hose to sea strainer.
background
41
Membrane Cleaning Procedure
Spectra cleaning compound (SC-2 or SC-3) must be mixed with fresh water at a rao of 1 container of
compound to 3 gallons (12L) of unchlorinated water. A Catalina 340R system requires one container of
compound per cleaning.
1. Close the intake seacock.
2. Push the Fresh Water Flush (FWF) buon to fresh water ush the system. Perform a second
fresh water ush in the same way.
3. Remove the quick disconnect ng from the brine discharge outlet of the Clark Pump, and
replace it with the quick disconnect brine discharge service hose. Lead it into a 5 gallon (20
liter) bucket. Push the Fresh Water Flush (FWF) buon and run the feed pump unl one gallon
of fresh water runs into the bucket from the brine discharge service hose. Press Stop.
4. Remove the hose from the “To Strainer” pigtail and install
the inlet service hose from the service kit. Lead both hoses
into the bucket.
5. Make sure that the pressure relief valve on the Clark Pump
is open (un-pressurized).
6. Mix the cleaning chemical in the bucket. If possible, heat the
soluon to 120 F (49 C).
7. Move manual switch on the Feed Pump Module to SERVICE
SYSTEM. The intake service hose will draw soluon from the
bucket and the brine discharge service hose will return it.
Circulate the soluon through the system in this manner for 45 minutes. Stop the pump by
moving the toggle switch back to ‘RUN AUTO’.
8. If the soluon cannot be heated, allow the soluon to sit overnight before proceeding to the
next step.
9. Replace the brine discharge overboard hose and run the pump unl the bucket is empty by
moving the manual switch to ‘SERVICE’. Return the switch to ‘RUN AUTO’.
10. Follow the New System Startup procedures to ush the chemicals out of the system (DO NOT
CLOSE the pressure relief valve!)
11. The system may now be restarted, ushed, or stored.
Connecng brine discharge
service hose
Removing hose to sea strainer
from the “to strainer” pigtail.
Aaching intake service hose to
the hose connecng to the sea
strainer.
background
42
Suggested Spares for the Catalina 340R
Short term cruising, weekends etc.
We suggest two treatments worth of preservave chemicals (either 2 bags of SC-1 or 2
gallons of Propylene Glycol). Six 5-micron lters and one Carbon lter.
Cruising 2 to 6 months at a me.
Twelve 5-micron lters, 2 Carbon lters, enough preservave chemicals for 4 treatments,
one replacement feed pump head.
Longer than 6 months
Addional lters, oshore cruising kit consisng of Clark Pump seals, O-rings, tools and
membrane cleaning chemicals. One replacement strainer screen, replacement O-ring for
strainer screen, and replacement O-rings for the lter housings.
Common Parts:
Item Part Number
SC-1 STORAGE CHEMICAL KIT-CHEM-SC1
SC-2 CLEANER KIT-CHEM-SC2
SC-3 CLEANER KIT-CHEM-SC3
BASIC CRUISE KIT A KIT-BCK-A
OFFSHORE REBUILD KIT KIT-OFFSH
5 MICRON FILTER FT-FTC-5
CHARCOAL FILTER FT-FTC-CC
6” STRAINER SCREEN FT-STN-6S
OIL/WATER FILTER FT-FTC-OW
FEED PUMP HEAD PL-PMP-140MAG
6” STRAINER O-RING SO-STN-6SS
CHARCOAL FILTER HOUSING O-RING (x2) SO-FHS-3PCS10
1/2” TUBE STEM X 1/2” NPT ADAPTER (x2) PL-STA-12TX12NJ
All sales are made through Spectra’s network of dealers/full service providers. Contact your
local full service provider for addional suggesons and support.
background
43
Feed pump runs constantly,
will not turn off
• Turn off manual switch on control box
• Manual switch in ON
position on control box
Display activates, but pump
will not run
• Loose or broken pump wire
connection
• Tanks are full (if equipped
with tank switch). If full, Run
& Stop LED should be lit.
• Check wiring at terminal block
inside control box
• Check tanks– system cannot be
started if tanks are full.
System runs, no product water
delivered to water tanks
• Disconnected or broken
product tubing
• 3-Way Valve Incorrectly set
• Check product tubing
• Check 3-Way Valve position
• Check pressure relief valve is tightly
closed.
Feed pump runs with loud
noise
• Intake blocked
• Air in system
• Check thru-hull valve
• Check sea strainer for leaks
• Check fresh water flush module for
leaks
• Re-prime system (restart)
Troubleshooting Catalina Remote Manual Systems
SYMPTOMS
PROBABLE CAUSE
REMEDY
High feed pressure, High Am-
perage, & Product Flow down
up to 15%
• Colder or more saline water
• Brine or product flow path
subject to back pressure
• Scaled or fouled membrane
• Normal condition
• Confirm by routing into a bucket to
test
• Clean Membrane
Feed Pump not running, no
noise
• No power at feed
pump
• DC speed controller
needs to be adjusted
• DC speed controller
malfunction
• Check voltage at
motor/speed controller
MTR leads
• Adjust speed controller
per manual directions
• Replace speed
controller
Feed pump turns on, no pressure
• Feed pump air locked
• Pressure relief valve open
• Open pressure relief valve
to bleed the air, then close
to start
• Close pressure relief valve
Low Feed Pressure, Low Am-
perage
• Warm saltwater or brackish
water
• Normal condition
No product flow, good brine
discharge flow,
Recovery percentage is 0 (See
Flow Test)
• Internal leak in Clark Pump
• While system is running, kink brine
hose to stop flow until pressure rises to
125psi (a few seconds), release hose
quickly, repeat no more than 10 times
in succession.
*NOTE: RELEASE HOSE AS SOON
AS VANE PUMP BEGINS TO LABOR
OR PERMANENT DAMGE MAY
OCCUR
• Inspect Clark Pump Check Valves
• Complete Service is recommended.
Contact Dealer or see Clark Pump
rebuild manual. Install Offshore Kit
background
44
SYMPTOMS PROBABLE CAUSE REMEDY
Low product flow. Recovery
percentage below minimum
nominal value (See Flow Test)
• Pressure relief Valve open
partially
• Internal leak in Clark Pump
• Close Pressure relief valve
• Complete service recommended. Contact
dealer of see Clark Pump rebuild manual.
• Install offshore kit
Troubleshooting Catalina Remote Manual Systems
Low product flow, more than 1
GPH Total flow down (see
flow test)
• Motor receiving less than
12.5 VDC
• Blockage or restriction in
system
• Thru-hull blockage
• Mineral Scaling
• Pump or Motor worn
• Check wiring for voltage drop. Increase
wire size if necessary
• Check voltage at speed controller
• If available, turn on battery chargers
• Replace prefilter, service strainer, check
all hose runs
• Confirm by using intake service hose and
bucket of seawater to bypass.
• Clean Thru-hull
• Perform SC-3 Cleaning (Note: By design, it
is rare for a membrane to cause low total flow
on Spectra systems)
• Pump should be able to push 2.7 G/M @
90-100psi
• Replace pump head
Asymmetrical pressure and flow
readings between pump shifts,
more than a few psi
• Scored Clark Pump annular
rings and/or reversing valve
spool
• Scored Clark Pump piston rod
and/or lip seals
• Scored Clark Pump cylinders
• Replace
• Confirm by opening test port on back
of Clark Pump. If constant flow,
replace seals and circular sand rod
(240 grit) or replace piston rod
• Hone, circular sand (240 grit) or
replace
background
45
SYMPTOMS PROBABLE CAUSE REMEDY
• Check brine discharge
• Check stac pressure
(pressure with system
running and pressure relief
valve open 1/2 turn)
*Nominal Stac Pressure
on CT340 is 25-35psi
• Route product vented to
atmosphere. Preferred
method is freefall into top of
tank.
• Diagnose by roung product
water into bucket and run
system
• Clean membrane
• Replace vacuum switch
Fault Light Illuminated
High Pressure or Vacuum Switch
• Blocked brine discharge
• Restricon in Clark Pump/
Membrane
• Product line not vented,
causing back pressure
• Fouled membrane
• Vacuum switch faulty
Boost Pressure Vacuum Switch
• Prelter/Sea Strainer clogged
• Intake restricon
• Boost Pump not receiving 24V,
or disconnected
• Vacuum switch faulty
• Install new prelters
• Clear strainer
• Clear obstrucon
*Check black 2-piece
hexagon check valve
aached to boost pump/
sea strainer module
• Check voltage at boost pump,
check wiring.
• Replace vacuum switch
Catalina 340R Fault Alarms
background
46
Catalina 340R Flow Test
The ow test is the most useful diagnosc test for system performance, and should be done
before replacing or cleaning your membrane. Changes in producon or water quality are
normally caused by something other than the membrane, unless the system has been le
unused for a long me.
Before the ow test, change all lters and clean the sea strainer. Carefully check for water or
air leaks, as air in the system will cause low producon and errac salinity. Look for air bubbles
in the product ow meter, feed water hoses, and brine overboard hose.
Run the system and watch the feed pressure very closely. If the feed pressure to the Clark
Pump is asymmetrical from one stroke to another, this impedes performance. A dierence of
a few PSI is acceptable, but anything over that is an issue. If the pump is asymmetrical, Clark
Pump repairs should be done before connuing with these tests.
If no asymmetry is noted, connue with this test.
You will need a graduated bucket, either a graduated pitcher or large measuring cup, and a
stopwatch. Log the voltage at the feed pump at the same time. Confirm at least 12.5 Volts at
the feed pump on 12-Volt DC systems.
Take two measurements and compare them with the table on the following page. The first
measurement is the product flow alone. The second is the product flow combined with the
brine discharge flow to get the total flow or feed flow. You may take these measurements by
two methods:
1. Time the product flow into a graduated pitcher, then divert both the product flow and brine
discharge together into a bucket, timing them to measure total flow.
OR
2. Divert the product flow into the pitcher while diverting the brine discharge into the bucket.
Time the flow of both at the same time. After calculating the product flow, pour the pitcher of
product into the bucket of brine to measure total flow.
The ratio of product flow to total flow gives us our recovery rate, as a percentage. If the
percentage is below the minimum it indicates an internal leak in the Clark Pump.
background
47
1. Product Flow: Product flow is expressed in Gallons Per Hour (GPH) or Liters Per Hour (LPH), by
this equation:
3600 ÷ time in seconds x quantity of water in gallons or liters = GPH or LPH
There are 3600 seconds in an hour.
Example: It took 3 minutes and 35 seconds to collect 1 gallon of product water.
3600 ÷ 215 x 1 = 16.74 GPH (3 minutes, 35 seconds is 215 seconds)
Example: It took 2 minutes and 25 seconds to collect 2.5 liters of product water.
3600 ÷ 145 x 2.5 = 62.07 LPH (2 minutes, 25 seconds is 145 seconds)
2. Total Flow or Feed Flow: Feed flow or total flow (brine + product) is expressed in Gallons Per
Minute (GPM) or Liters Per Minute (LPM) , by this equation:
60 ÷ time in seconds x quantity of water in gallons or liters = GPM or LPM
Example: It took 1 minute and thirty-seven seconds to collect 5 gallons of total flow.
60 ÷ 97 x 5 = 3.09 GPM (1 minute, 37 seconds is 97 seconds)
Example: It took 53 seconds to collect 12 liters of total flow.
60 ÷ 53 x 12 = 13.58 LPM
3. Recovery Rate: Product Flow ÷ Total Flow = Recovery Rate %
Example: 6.5 GPH product flow = .063 or 6.3%
1.7 GPM total flow x 60
(you must first multiply total flow by 60 to convert from GPM to GPH)
*pressure relief valve open ½ turn
In order to make good quality product water, you need the proper amount of feed water ow, as
in the table below. Compare the product ow to the total feed ow. Product ow should be 9.0%
of total ow for a Catalina 340R. If product percentage is low, you may have an internal leak in the
Clark Pump.
For every
1
/
10
th
of a GPM feed water ow loss, we will lose about
1
/
2
gallon per hour of product
ow and the salinity will go up 100 PPM.
System
AMPS Feed Pressure Static * Total Flow/Feed Flow Product Flow
Product
Quality
12V MAX 24V MAX PSI bar PSI GPM LPM
GPM
(min)
LPM
(min)
GPH LPH
GPH
(min)
LPH
(min)
TDS
Catalina 340 19.5 21.5 9.75 10.75 90-100 6.3-7 25-35 2.8 10.6 2.7 10.2 14 52.9 13.5 51.0
< 300
background
48
Poor Product Water Quality
With any product water quality issue, you must ensure accurate calibraon if you are using a
salinity meter. For general quality evaluaon, your taste is always good enough.
Membranes are not an exact science and two idencal systems can have dierent product
quality. World health standards deem water of up to 1000 PPM of total dissolved solids
acceptable for drinking. We consider any thing below 750 PPM acceptable but not ideal, and
anything below 500 PPM excellent. Factors that could aect water quality are addressed
below.
LOW SYSTEM FLOW OR PRESSURE will equate to lower product quality (higher PPM).
Catalina systems, which have a higher feed to output pressure rao (See nominal
pressures under Flow Test, page 43), as well as a higher feed ow/membrane area
rao, will produce water in the 150-300 PPM range.
DAMAGE TO THE MEMBRANE by chlorine contaminaon. Flushing the system with
chlorinated water will irreparably damage the membrane. Charcoal lters are used to
absorb any chlorine which might be present in ush water. They must be of proper
specicaon to be suitable. See page 48. There is no test for chlorine damage except
the process of eliminaon of other causes.
DIRTY OR SCALED membranes. A dirty (foreign material), scaled (mineral deposits), or
contaminated (bacterial growth) membrane can result in poor water quality and
abnormal operang pressures. If operang pressures are above normal, then cleaning
is indicated. If the system pressures are within operang normal range, cleaning may
have lile result. Avoid cleaning as a diagnosc tool. Low water quality aer storage
with propylene glycol can usually be remedied by extended ushing or an SC-2
cleaning.
MECHANICAL LEAKAGE within the membrane pressure vessel. This is an unlikely but
possible cause of poor water quality. A pinched or damaged O-ring within the
pressure vessel, a scratch on the product tube on the membrane, a scratch within
one of the end caps, or a seal fouled by contaminaon could allow sea water into the
product water.
If system total ow (product plus brine) is 2.7 GPM (10 liters) or above, the membrane is
clean, the product ows are consistent with the system ow and the water quality is sll not
acceptable, then replacement of the membrane is indicated.
background
49
Technical Bulletins
The following pages include Spectra’s most commonly-used technical bullens, covering tests,
adjustments, troubleshoong, and common points of confusion. Many more technical
bullens are available on the Spectra website, www.spectrawatermakers.com.
ACCUMULATOR PRESSURE
Your Catalina 340R is supplied with a pressure accumulator tank (PL-ACC-TK) installed in the
feed water line between the feed pump and the Clark Pump.
The purpose of the feed line accumulator is to reduce the spikes in the feed pressure caused
by the cycling of the Clark Pump. If the accumulator is not properly charged it can lead to
pressure spikes and system shut down. The accumulator has a Schrader air valve, like a car
re, which allows the internal air bladder of the accumulator to be pre-charged. The
accumulator should be pumped up to about 60 psi (4.1 bar) for best results. Add air using a
re pump or air compressor. You can experiment with the exact pressure that will give the
best pulsaon dampening on your installaon.
Schrader valve
background
50
PREFILTERS
It is important to remember that your Spectra Watermaker is designed to process clean, open-
ocean seawater. Any departure from that standard for your seawater intake runs the risk of causing
excessive wear or damage to internal pump parts and/or the vulnerable reverse osmosis mem-
brane. Addional preltraon consideraons and/or extremely frequent prelter replacements may
be required in any deviaon from open-ocean seawater. Your local service provider or installer may
have specic recommendaons based on their experience with water condions unique to your re-
gion.
Observe the seawater around your vessel. Is it clean enough to use for your seawater intake? There
are several things to avoid feeding to your watermaker:
• petroleum products, such as oil, fuel, thinners, paints, paint removers, etc.
• chlorine-treated water; e.g., most “dock” water
• silty water — water contaminated by ne, hard, suspended parculates
• putrid water, “red des”, or any seawater that smells or looks contaminated
• harbor/marina water that you cannot see through or that shows visible signs of
contaminate (neighboring boats docked nearby may be discharging contaminaon!
Sewage, chemicals, etc.)
Judging the quality of seawater input always involves a certain calculated risk. We know of watermak-
er systems that have been destroyed far oshore by intaking fresh whale excrement or oil contami-
nants from natural seepages. The chance of such things happening is normally small but should be
considered. On the other hand, regularly running a watermaker in an enclosed marina or harbor
runs a much higher risk of harmful contaminaon. If you need to test a new installaon while in a
marina or harbor, monitor the water quality around your vessel carefully while tesng. Oen mes
you should be able to run the watermaker safely for enough me to briey check out the system if
you are mindful of external feed condions. If this is not possible, an arcial ocean is a useful
alternave (see Page 29 for arcial ocean tesng/instrucons). Don’t sail away without tesng a new
installaon or repair!
During normal operaon, the feed water is ltered in two stages. First it passes through a ne mesh
metal sea strainer, which protects the feed pump from foreign materials and sea creatures. Aer
passing through the feed pump, the feed water passes the lter housings containing 20 and 5
micron elements, removing very ne parcles that could damage the Clark Pump and shorten
membrane life. An addional carbon lter prevents the entrance of chlorine during fresh water
ushing (see next page).
Prelter maintenance schedules will vary widely depending on how and where the system is used. If
large amounts of feed water are run through the system over a relavely short period of me in
biologically ferle near-shore waters, the prelters will plug up, water producon and quality will
drop, and the system pressure will change dramacally. In blue water condions the prelters may
only need to be changed every week or two.
When operated for only an hour or two a day in inland or near-shore waters, the trapped plankton
will begin to decay in the lters long before the elements plug up. The decaying plankton and
bacteria will cause a roen egg smell in the product water. This decay will set in overnight in tropical
waters, or aer a week or two in higher latudes
background
51
CHARCOAL FILTERS
The charcoal lter element (FT-FTC-CC) removes chlorine from the fresh water ush water supply, as
the RO membrane can only handle small amounts of chlorine without permanent damage.
The charcoal lter used for the fresh water ush system will not plug up unless you have very dirty
domesc water in your boat’s supply tank.
The charcoal lter we supply removes 99.7% of the chlorine. Beware when buying other charcoal
lters. If they don’t specify the percentage of chlorine removed, don’t use them. Cheap ones may
remove only 60% or 70%. Also, there are aermarket lters which are very close to, but not exactly,
the right dimensions, and they will not seal in the housing. If you skimp on the charcoal lter you risk
damaging a $600.00 membrane on the rst ush. The other factor is the ow rate that the lter can
handle. Because the chlorine is adsorbed by the charcoal, it must remain in contact with the charcoal
for a sucient period of me for the all of the chlorine molecules to be captured. The lters we use
can handle 1.5 gallons (6 liters) per minute ow, and are good for 3000 gallons (12,000 liters) at 1.5
GPM, or six months, whichever comes rst. Regardless of the amount of water treated, the charcoal
loses its eecveness aer six months.
5 Micron
20 Micron Optional Oil/Water Separator
Charcoal lter, Spectra part number FT-FTC-CC
PREFILTERS CONT.
Our lter element part numbers are FT-FTC-XX, where the last digits indicate the micron rang. FT-FTC
-5 is for a 5 micron element, FT-FTC-20 is a 20 micron element.
The oponal oil/water separator is FT-FTC-OW.
background
52
Catalina 340R Wiring Schematic
background
53
Catalina 340R Wiring Schematic
background
54
Control Box Wiring
1. PWR IN+ 5. TANK SW 9. PWR RELAY+ 13. D.V.+
2. PWR IN- 6. TANK SW 10. PWR RELAY- 14. D.V.-
3. PRS. SW 1+ 7. BOOST PUMP+ 11. FWF SPEED+ 15. FWF+
4. PRS SW 2- 8. BOOST PUMP- 12. FWF SPEED- 16. FWF-
Multiple
Display Ports
Switches for Relays 7-13
Main Power
Connection Terminal
Block
background
55
Optional Z-Ion Protection System
The Z-Ion, developed by Spectra, protects the enre system from fouling for extended periods
without fresh water ushing or storage chemicals (pickling).
The Z-Ion achieves this end by introducing a stream of metallic ions into the fresh water ush
water, thus ooding the enre system with ions that prevent biological growth for up to thirty
days. If you are going to let your system sit idle for longer than thirty days, you will sll need to
treat it with SC-1 storage chemical or propylene glycol.
The Z-Ion will not prevent freezing, so in freezing climates pickling with propylene glycol is sll
required. Even with the Z-Ion there may sll be cases when you need to pickle your system
with SC-1 storage chemical or propylene glycol, so we recommend you carry one of these
products at all mes.
If your system was ordered with the Z-Ion, it will require only some basic wiring and
commissioning, laid out in the following pages.
If you didn't order you system with the Z-Ion, it can be retroed to any Spectra system.
NOTE: Contact Spectra for more informaon at: techsupport@spectrawatermakers.com
background
56
Z-Ion Installation
NOTE: If you did not order your Cape Horn Xtreme with the oponal Z-Ion you may disregard
this secon of the manual.
If you ordered your Cape Horn Xtreme with a Z-Ion, the feed pump module will come with the
Z-Ion installed in place of the standard fresh water ush module, as shown, with a separate Z-
Ion electronic control box:
Z-Ion control box: Mount in a
visible locaon near the feed
pump module.
Connector for generator bowl
Z-Ion power cable with in-line
fuse: Connect to the system
electrical bus or other source
of ship’s power.
DANGER
Control Box:
On/O switch
Fresh water ush valve:
manually opened at the start
of the cycle and closed at the
end.
Generator bowl with charcoal
lter.
DANGER
System electrical bus bar: Z-Ion
will connect here (or any
convenient connecon to ship’s
power).
Feed Pump Module:
Hose barb
connecon to
house pressure
water system,
with valve
Generator bowl connector
background
57
Z-Ion Installation - Cont.
DANGER
Z-Ion Power Connecons
Turn the main DC breaker o or remove the main power fuse to the watermaker.
Locate the DC Bus Bar for the watermaker (or any other DC power source), as shown below.
Connect the DC power leads from the Z-Ion Control Box to the Incoming DC Bus Bar.
• Pay aenon to polarity!
• Connect Red (fuse) to DC +
• Yellow (or black) to DC -
• Replace protecve cover
Z-Ion Fuse holder: Install in a dry
locaon with easy access.
Connecon from generator bowl to control box:
The pigtail form the control box has a water-ght connector, which connects to the pigtail
from the generator bowl:
background
58
The Z-Ion should be energized at all mes, but will only consume power when operang. Upon
inial power-up the LED will ash red/green and then will turn solid green.
Follow the instrucons for Normal Operaon and Fresh Water Flush. For treatment with the
Z-Ion, the process is idencal, only the Z-Ion will release silver and copper ions into the ush
water when you turn on the generator with the on/o switch. Turn on the ion generator at the
same me that you open the ush valve.
The operaon cycle begins and the LED will ash green/amber. The cycle will connue unl you
turn o the ion generator or the adjustable mer mes out (factory set for 15 minutes).
Turn o the ion generator at same me that you close the ush valve. If you forget to turn o
the ion generator, the Z-Ion will me out aer 15 minutes, so no harm will be done to the unit.
If the voltage is out of range, below 10V or above 56V, the LED will ash red every two seconds
and the unit will shut down.
Each fresh water ush with the Z-Ion will protect your watermaker for up to 30 days, aer
which the process must be repeated.
Aer 720 cycles the service light on the front of the control box will light up, indicang that the
probes on your Z-Ion may be wearing down, and should be tested. The service light is just a
reminder, and the Z-Ion will go on funconing while it is lit.
DANGER: To reset the service counter, touch two magnets, at the same me, to the two red
reed switches on the Z-Ion circuit board, labeled Switch 1 and Switch 2 below.
Z-Ion Operation
Switch 1 Switch 2
Pin 1
Pin 7
Z-Ion Circuit Board Layout
background
59
background
60
Exploded Views and Part Numbers
FT-PV-40
40” High Pressure Vessel
PL-MTS-3/8X1/2B
3/8"NPTX1/2"Tube Fitt. St.
SO-HPP-CT
Connector O-ring
PL-HP-1/8
1/8NPT Nylon Hex Plug
PL-TB-HPTPVUL
Pump to Pressure Vessel
Upper SS Tube Long
SUB-CT-Z-HPILHA
CT 340R Quick Disconnect Kit
PL-TEE-1/2TJG
John Guest 1/2-inch swivel tee
PL-STA-12Tx38NJ
1/2”Tube Stem x 3/8” NPT
adapter John Guest
Accumulator Hose:
20 inches 1/2-inch vinyl hose PL-HS-1/2VN
(2) brass ferrules PL-HF-.75lDX1BR)
(2) 1/2-inch hose barb tube adapters PL-HBA-1/2Tx1/2
5 inches of 3/4-inch spiral wrap EL-LT-3/4SW
Hose clamps may be substituted for the brass ferrules,
which are crimped on.
FT-PV-ER
Pressure Vessel
End Ring
PL-SWF-1/8X1/4J
1/8” NPT to 1/4”
Tube Parker Elbow
PL-ACC-TK
Accumulator Tank
(Shipped at 60psi)
PL-HP-1/2N
1/2” X 1/4” Hex Bushing Reducer
PL-SWF-1/2x1/2
1/2”NPT x 1/2” Tube
John Guest swivel elbow
Accumulator
High Pressure Module
PL-TB-HPTPVLL
Pump to Pressure Vessel
Lower SS Tube Long
KIT-PV-25EP1
Pressure Vessel
End Cap Kit
PL-MTE-1/4X1/4J
1/4”NPT X 1/4” TUBE
FITTING NYLON
background
61
Part Numbers
EL-MTR-1/6D12
12 VDC MOTOR
PL-PMP-140MAG
MAG DRIVE PUMP
EL-PS-24V240WDC
Boost Pump Voltage
Booster
EL-MTR-PWM
Motor Speed
Controller
FM-MPC-MPCB
MPC BOX
EL-TM-RJ45CPS
RJ-45 Modular
Coupler Straight
FT-FTC-5
5 MICRON FILTER ELEMENT
FT-FTH-10L3PCS
3 PIECE 10” FILTER HOUSING
PL-HBE-3/4X3/4
3/4” NPT X 3/4” HOSE
BARB ELL NYLON
PL-BSH-3/4X1/2N
3/4" X 1/2" HEX
BUSHING REDUCER
NYL
FT-FHB-3PCSHSS
MOLDED FILTER
BRACKET
EL-SWT-TSBHC
TOGGLE SWITCH BOOT SEAL
EL-SWT-TG-DPDT
TOGGLE SWITCH DP/DT
PL-SWF-1/2X1/2
1/2"NPT X 1/2” TUBE
SWIVEL ELBOW
PL-NLT-1/2LP
1/2" LOW PRESSURE
TUBE
HD-OTH-1/4TS1D
1/4"-20 x 9/16” NYLON
THUMB SCREW 1D
Feed Pump Module
background
62
PL-HS-3/4SH
3/4" REINFORCED
SUCTION HOSE
PL-HS-3/4VN
3/4" VINYL HOSE
PL-HS-5/8VN
5/8" VINYL HOSE
PL-NLT-1/4LP
1/4” Low Pressure Tube
(Product)
Hoses and Tubes
Note: Hose clamps may be substuted for brass ferrules, which require a special crimper.
Inlet/Flush Hose Assembly (SUB-CT-Z-HPIBHA):
PL-HS-1/2VN
1/2" VINYL HOSE
PL-QDC-1/2HBDWV
1/2” HB QUICK DISCT. BODY
WITH VALVE
PL-HBA-1/2TX1/2
1/2” TUBE x 1/2” HB ADAPTER
Brass ferrules for 1/2-inch hose
(PL-HF-.75lDX1BR)
Part Numbers
KIT-REM-RMC SPECTRA MANUAL
REMOTE CNTRL. KIT
PL-UNN-3/8x1/4N
3/8”FPT x 1/4”
FPT COUPLING
NYLON
PL-TEE-1/2TJG
1/2” TUBE
TEE JG
PL-STA-12TX38NJ
1/2” TUBE STEM x 3/8” NPT
ADAPTER
EL-SWT-VC
VACUUM SWITCH
EL-SWT-PS120
PRESSURE SWITCH 120 PSI
SUB-MD-PNLA380 REMOTE GAUGE
PANEL ASSEMBLY KIT
background
63
Parts I.D.
Fresh Water Flush Module
Note: The Fresh Water Flush
module without Z-Ion will
have the same parts, minus
the modified filter bowl,
sticker, and control box.
PL-BSH-3/4X1/2N
3/4" X 1/2" HEX BUSHING
REDUCER NYLON
PL-MFF-1/2X1/2
1/2” NPT X 1/2"FPT ELBOW
FITTING NYLON
PL-FRG-1/2MF1.5
1/2" NPT –FPT FLOW REGULATOR
1.5 GPM 20-80 psi
FT-FTC-CC
CHARCOAL FILTER
(filter catridge not shown)
PL-HBS-1/4X1/2
1/4" NPT X 1/2" HOSE
BARB ST. NYLON
PL-MFF-1/4X1/4
1/4"NPT X 1/4"FPT
ELBOW FITTING NYL
PL-BSH-3/4X1/4N
3/4" X 1/4" HEX
BUSHING REDUCER NYLON
PL-NP-1/4N
1/4" NPT CLOSE
NIPPLE NYLON
PL-SLN-1/4O12SV
12V FRESH WATER
FLUSH SOLENOID
PL-UNN-1/2N
1/2" FPT COUPLER NYLON
PL-QDC-1/2CP
1/2" NPT COLDER COUPLER
FT-FTH-10L3PCS
10" LOW PRESS. FILTER HOUSING
3 PCS (without Z-ION)
PL-HBS-1/4X1/2
1/4" NPT X 1/2" HOSE
BARB ST. NYLON
PL-MFF-1/4X1/4
1/4"NPT X 1/4"FPT
ELBOW FITTING NYL
PL-BSH-3/4X1/4N
3/4" X 1/4" HEX
BUSHING REDUCER NYLON
PL-NP-1/4N
1/4" NPT CLOSE
NIPPLE NYLON
PL-SLN-1/4O12SV
12V FRESH WATER
FLUSH SOLENOID
PL-BSH-3/4X1/2N
3/4" X 1/2" HEX BUSHING
REDUCER NYLON
PL-MFF-1/2X1/2
1/2” NPT X 1/2"FPT ELBOW
FITTING NYLON
PL-FRG-1/2MF1.5
1/2" NPT –FPT FLOW REGULATOR
1.5 GPM 20-80 psi
FT-FTC-CC
CHARCOAL FILTER
(filter catridge not shown)
PL-UNN-1/2N
1/2" FPT COUPLER NYLON
PL-QDC-1/2CP
1/2" NPT COLDER COUPLER
FT-FTH-10L3PCS
10" LOW PRESS. FILTER HOUSING
3 PCS (without Z-ION)
Not Pictured: Z-ION Control Box
Z-ION Configured Fresh Water Flush Module
background
64
PL-HBS-3/4X3/4
3/4" NPT X 3/4" HOSE
BARB ST. NYLON
PL-CKV-1M3/4FWS
1"MPT X 3/4" FPT
CHECK VALVE W/S
EL-FP-BPLDC824
300-1K BOOST PUMP
8-24VDC 1/2"NPT
PL-FHB– 1/2x3/4E
1/2"FPT x 3/4” HOSE BARB NYLON
FM-ZION-SBPBRK
Z-ION STRAINER BOOST
PUMP BRACKET
PL-BHF-3/8TSTJG
3/8T BULKHEAD FITTINGNST. JG
PL-BHF-3/8TPIEJG
3/8” TUBE PLUG-IN ELBOW
PL-CLP-114CAR
1-1/4” CARLON CLAMP
SUB-STN-6WBH3/8
6" STRAINER WITH BULK
HEAD FITTING 3/8" TUBE
PL-BSH-1x1/2N
1” NPT x 1/2” FPT HEX REWDUCER NYLON
Parts I.D.
Sea Strainer & Boost Pump Module
KIT-NP-M2Z-SBPH
Not pictured here:
EL-FUS-15AMICHD 15A MICRO FUSE HOLDER
EL-FUS-5AMIC2 5A MICRO2 FUSE
Raw Plastic Sea Strainer
FT-STN-6SP
6" STRAINER SCREEN PLASTIC
FT-STN-6NS
6" STRAINER NO SCREEN
FT-STN-6S
6” Strainer Screen (Inside)
background
65
HP-TB-VEB-B
HP-TB-VB
HP-TB-VEB-A
HP-TB-BV
HP-CB-CB10
HP-CYL-SST
HP-CYL-R
HP-CYL-EC
HP-CYL-CCA
Not used
background
66
HD-CPS-5/162.75
SO-HPP-SP
HP-TB-VSP
HP-TB-SR
SO-HPP-VB
SO-HPP-PLP
SO-HPP-VP
HD-CPS-5/16X3
KIT-HP-10VSA
HP-TB-ARP
SO-HPP-AR1
SO-HPP-RV
HP-TB-BV
89
background
67
Parts
1
background
68
PL-MTS-3/8X1/2B
HP-CYL-SST
HP-CYL-CCA
SO-HPP-ECCB
HP-CYL-EC
HP-CYL-R
HP-CYL-PT
Parts
background
69
SPECTRA WATERMAKERS LIMITED LIFETIME WARRANTY
THIS LIMITED WARRANTY APPLIES TO THE ORIGINAL OWNER OF THE WATERMAKER AND IS NOT TRANSFERRABLE
For warranty information regarding products sold within the European Union please contact
europe@spectrawatermakers.com.
This limited product warranty is provided by Katadyn Desalination LLC, a Business Unit of the Katadyn
Group. (“Manufacturer” of “We” or “Our”) to the original, consumer owner of the product (“You” or
“Your”) with which this limited product warranty is provided (the “Product.”)
The Manufacturer warrants to You that the product will be free from defects in material and workmanship
under normal use and regular service and maintenance, subject to the exclusions described below, for a period
of year (the “Warranty Period”) after date of installation, or 15 months after the shipment date, whichever
comes first. This warranty will be extended for an additional 12-month period when the product is installed
and commissioned by a Katadyn Desalination Authorized Installer. A Spectra Watermakers Commissioning
Report must also be returned and approved by the factory. The Spectra Clark Pump has a Limited Lifetime
Warranty on Marine systems to the original consumer owner of the product, not inclusive of repair or
replacement parts due to wear over time. If the Spectra Clark Pump is used in a Landbased application, the
product warranty is provided for a period of year (the “Warranty Period”) after date of purchase (if purchaser
is installing system) or date of commissioning (if Spectra dealer is installing system).
You will be required to show written documentation supporting the date of purchase or date of
commissioning. If you are unable to provide documentation supporting the date of purchase or
commissioning, the warranty period shall be based on the product’s date code and will be determined by the
Manufacturer’s sole and absolute discretion.
WHAT IS COVERED
Katadyn Desalination LLC. warrants, for the period defined above, that the Product will be free from defects
in materials and/or workmanship and will conform to Manufacturers published specifications if installed
and maintained in accordance with the Manufacturers Instructions.
WHAT IS NOT COVERED
The Warranty does not include service, repair, or replacement to correct damage caused by improper
installation, maintenance, improper connection with water systems, external electrical fault, accident,
alteration, misuse, abuse, neglect, negligence, (other than Manufacturer’s), acts of God, failure to install or
maintain the product in accordance with the Manufacturers instructions.
DAMAGED OR MISSING PRODUCT
You must examine the Product upon receipt and notify Katadyn Desalination LLC. if any item is damaged or
missing within 30 days from the date of the delivery. Damage due to freight must be reported to Katadyn
Desalination LLC. and to the freight carrier within 24 hours of delivery.
background
70
SOLE WARRANTY
THE PRODUCTS AND ARE IN LIEU OF AND
EXCLUDE ALL OTHER WARRANTIES, EXPRESS OR IMPLIED, ARISING BY OPERATION OF LAW OR
PRODUCTS ARE SPECIFICALLY DESIGNED AND/OR MANUFACTURED BYMANUFACTURER FOR
YOUR USE OR PURPOSE.
WHAT WE WILL DO TO CORRECT PROBLEMS
If You return the defective product during the warranty period and in accordance with the instructions
contained herein, shipping prepaid, the Manufacturer shall, at its option and as Your exclusive
remedy, repair, correct or replace the product at no charge if the product is found by the
Manufacturer to be a valid warranty claim, in Manufacturer’s sole discretion. Replacement product
may be refurbished and/or different models but will be functionally equivalent to the product or
hardware being replaced. Product repaired or replaced during the warranty period shall be covered
by the foregoing warranty for the remainder of the original warranty period or ninety (90) days from
the date of shipment or purchase, whichever is longer. Contact your Dealer or the Manufacturer’s
Customer Service at 415-526-2780 to obtain a returns materials authorization (RMA #).
HOW TO MAKE A WARRANTY CLAIM
If You discover any warranty related issues after 30 days, or You have questions concerning Your
product or how to determine when service is needed, please contact your local dealer or contact the
Manufacturer’s Technical Support at 415-526-2780 or email the Manufacturer at
techsupport@spectrawatermakers.com. The following information must be provided as part of Your
warranty claim: your name, address, phone number, Your products’ model number, Your product’s 4-
digit serial number, and if necessary, upon request, written confirmation of the date shown on Your
purchase receipt and the purchase price paid for the product. All products being returned to the
Manufacturer must have a return material authorization (RMA) number to be processed. Any item
returned to the Manufacturer without an RMA number will not be accepted by the Manufacturer
Contact your Dealer or Customer Service to obtain an RMA number. Once we have received Your
returned product, we will determine, in our sole and absolute discretion, whether Your claim is covered
by, or excluded from, this limited warranty. Repairs or modifications made to the product by other than
the Manufacturer will nullify this limited warranty. Coverage under this limited warranty is
conditioned at all times
upon the original purchaser’s compliance with these required notification and repair procedures.
LIMITATION OF LIABILITY TO THE FULLEST EXTENT PERMITTED BY LAW, IN NO EVENT, SHALL
MANUFACTURER OR ITS AUTHORIZED SERVICE REPRESENTATIVES BE LIABLE FOR ANY
INCIDENTAL, SPECIAL, INDIRECT, OR CONSEQUENTIAL DAMAGES, INCLUDING ANY ECONOMIC
LOSS, WHETHER RESULTING FROMNONPERFORMANCE, USE, MISUSE OR INABILITY TO USE
THE PRODUCT OR THE MANUFACTURER'S OR ITS AUTHORIZED SERVICE REPRESENTATIVE’S
NEGLIGENCE. THE MANUFACTURER SHALL NOT BE LIABLE FOR DAMAGES CAUSED BY DELAY
IN PERFORMANCE AND, IN NO EVENT, REGARDLESS OF THE FORM OF THE CLAIM OR CAUSE OF
ACTION (WHETHER BASED IN CONTRACT, INFRINGEMENT, NEGLIGENCE, STRICT LIABILITY,
OTHER TORT OR OTHERWISE), SHALL MANUFACTURER’S LIABILITY TO YOU EXCEED THE
PRICE PAID BY THE ORIGINAL OWNER FOR THE MANUFACTURER’S PRODUCT.
The term “consequential” damages shall include, but not be limited to, loss of anticipated profits,
business interruption, loss of use or revenue, the cost of capital or loss or damage to property or
equipment. Some states do not allow the exclusion or limitation of incidental or consequential
damages, so the above limitation may not apply to you. This limited warranty gives you specific legal
rights, and you may also have may other rights which vary from State to State.
background
71
Spectra Product Registration Form
Registration (To be completed by owner)
Boat model or type (i.e. Leopard 44, Beneteau 55' powerboat, catamaran, powercat, 42’ sailboat…)
______________________________________________________________________________
What type of boating will you be doing and what will the watermaker primarily be used for:
______________________________________________________________________________
______________________________________________________________________________
______________________________________________________________________________
Submission for Approval:
Please submit this document along with the Installaon and Commissioning Reports to Spectra
Watermakers for approval. Submissions can be submied online, scanned and emailed, or mailed directly
to the factory. Spectra Watermakers Technical Support will email the original owner and the authorized
distributor with the status of submission.
Web-Based Format (Preferred opon):
spectrawarranty.formstack.com/forms/product_registraon
spectrawarranty.formstack.com/forms/spectra_install_commissioning_report
Email: TechSupport@SpectraWatermakers.com
Phone: +1(415) 526-2780
Address: Katadyn Desalinaon
Technical Department
2220 S. McDowell Blvd Ext
Petaluma, CA 94954
USA
Please keep a copy of these reports for your records.
Any commissioning/install report (and additional 12 month warranty) may be rejected at the
sole discretion of Spectra Watermakers if the system is not installed correctly.
System Details:
Model ________________________ Date of install: ______________________________
4-digit S/N___________ Clark Pump S/N: _____________ Voltage_______
Dealer/distributor:____________________ Boat Location:___________ max speed:______
Original Owner Details:
Name:_________________________________ Phone Number:________________________
Email Address:________________________________________________________________
Address (Optional):____________________________________________________________
____________________________________________________________________________
____________________________________________________________________________
CUT HERE
background
72
Spectra Watermakers Installation Report
(To be completed by authorized installer)
INLET
□ Inlet Seacock is below waterline
□ Inlet Seacock is dedicated
□ Inlet Seacock is shared
□ Inlet Thru-Hull forward facing scoop
□ Has strainer
□ Has diving snorkel
□ Has sea chest
□ Other
Thru Hull Size: ____________IN/CM
Approximate location on vessel and notes:_____________________________________
_______________________________________________________________________
SEA STRAINER/BOOST PUMP MODULE
□ Module is below waterline
□ Clearance for filter sea strainer servicing
Notes:__________________________________________________________________
_______________________________________________________________________
FEED PUMP MODULE
□ Feed pump module is mounted upright
□ Clearance for filter cartridge changes
□ Intake hoses are free of kinks
Distance from waterline: ________FT/M above/below the waterline
Hose length from boost pump module: _____FT/M
HIGH PRESSURE MODULE and BRINE DISCHARGE
□ Pressure relief valve is accessible
□ Brine discharge has no obstructions and vents to atmosphere
Notes:___________________________________________________________________
________________________________________________________________________
PRODUCT WATER TUBING
□ Product water flows into top of freshwater tank
□ Freshwater tank is vented
Notes:____________________________________________________________________
_________________________________________________________________________
The following checklist is designed to confirm that the watermaker installation meets Spectra
standards. Fill out the checklist as completely as possible. Check any boxes that apply and
note any concerns. Please document any discrepancies or concerns with photos.
INSTALLATION SIGN OFF
Technician’s Name: __________________________________________ Date: ________
Technician’s Signature: __________________________________________________________
Distributor/Dealer_______________________________________________________________
CUT HERE
background
73
Spectra Watermakers Commissioning Report – Page 1
(To be completed by authorized installer)
Fill out the below checks as completely as possible. Check any boxes that apply and note any concerns.
PURGE
□ Storage Chemicals have been purged with PRV open
Length of purge: _______Minutes
□ Diversion Valve is up, in reject position
□ Filter condition has been calibrated
□ “Run Manual” switch engages full speed
□ “Service” switch engages flush speed
RUN HIGH MODE CHECKS
Product Flow: _____________ GPH/LPH
Confirmed Product Flow Rate ___________GPH/LPH
□ Technician Flow meter. Brand________________
□ Hand Measurement _______Gal/Liters in _____SEC/MIN
Product Quality: __________ PPM
□ Confirmed product quality with handheld TDS meter
Feed Pressure: __________ PSI/BAR
Boost Pressure (with clean prefilters): ________PSI/BAR
Brine Flow Rate: _______________ GPM/LPM
Measurement taken with:
□ Technician Flow meter. Brand_________________
□ Hand Measurement: _______Gal/Liters in _____SEC/MIN
□ Boost Pump runs
□ Output and motor speed decrease when low mode is engaged
Notes:__________________________________________________________
______________________________________________________________________
FRESHWATER FLUSH
□ Freshwater Flush solenoid valve opens
□ Feed Pump is not cavitating when system flushes with seacock closed
Ship's pressurized freshwater pump flow & pressure rating ________ GPM/LPM ________ PSI/BAR
When seacock is open, what is the ppm of brine discharge at the end of the flush_______
Flush duration is ________Minutes
□ Needed to change flush time
□ Needed to change speed of feed pump during flush
Notes:__________________________________________________________
______________________________________________________________________
*If the system does not have a dedicated forward-facing scoop type thru-hull or will be on a vessel that
moves faster than 15 knots the system needs to complete the following sea trial checks. Spectra
Watermakers reserves the right to require a sea trial from any customer before approving a
commissioning report.
SEA TRIAL
□ Watermaker will flush while underway
□ Watermaker will start while underway
While the vessel is underway moving _______KNOTS/MPH/KPH the watermaker is producing
_______ GPH/LPH at ______PPM
The following checklist is designed to confirm that the watermaker installation meets Spectra
standards and that the system is performing at specification.
CUT HERE
background
74
Spectra Watermakers Commissioning Report – Page 2
OWNER EDUCATION
Owner has been trained on the following:
Know locations of
□ Seacock/Thru-hull
□ Sea strainer module
□ Prefilter (and/or) Feed Pump Module
□ Freshwater Flush Module
□ High Pressure Module
□ Clark Pump Pressure Relief valve
□ Product water inlet to Freshwater Tank
□ Brine Discharge location
□ Service hoses and storage chemicals
□ User Manual
□ How to power the watermaker off and on at the main breaker.
□ How to run the watermaker.
□ How to freshwater flush and the importance of freshwater flushing.
□ Knows when the ships domestic freshwater pump is on.
□ Knows which prefilter cartridges to use and how to change them.
□ Knows how to service the sea strainer module.
□ Knows where the carbon block filter is and is familiar with (6 months) service frequency.
□ Knows how to run the system via “RUN MANUAL.” Including knowing how to bypass the diversion valve and
sample the product water before it enters the tank.
□ Understands the risks of running the system in run manual.
□ Have visually seen the overboard brine discharge (Should know when the system is pumping water).
□ Know where freshwater enters the tank, would be able to manually sample/taste water if necessary.
□ Understand when the Clark Pump is under pressure and cycling.
□ Has felt the boost pump when the system is on and when the system is off.
□ Understand the relationship between the boost pump and filter condition as well as feed pump health. Note the
filter condition change when boost pump cable is disconnected.
□ Be able to identify feed pump cavitation (this is the sound the feed pump makes when the system is running,
and the seacock is closed momentarily.)
□ Have seen how the service hoses and bucket are used to circulate seawater or freshwater through the system.
□ Have heard the difference speeds of the vane pump (the difference between Run Hi and Service speed.)
Notes:_____________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
COMMISSIONING REPORT SIGN OFF
Technician’s Name: ____________________________________________________________
Technician’s Signature: _________________________________________________________
Owner’s Name________________________________________________________________
Owner’s Signature_____________________________________________________________
CUT HERE
background
75

Specifications

Indexed Terms: Reverse Osmosis

Spectra Watermakers CT-340R Questions and Answers

Questions and Answers

Related Products