Loading ...
Loading ...
Loading ...
Page 25
INSTALLATION
Step 5
Place the modular into the opening of ceiling,
connect the ducting. When ducting is xed to the
modular, secure it with the xing (Figure D).
Step 6
To connect the electrical cable of the lid to the
connections box and x the lid with the screws, it
must remain joined to the body (Figure E).
Step 7
Close the lid until it remains xed with the magnets
(Figure F).
Step 8 Control Module
Connect each power plug to the control module.
Then connect mains power cable and motor cables.
Each module connects to one of the four
connectors on (A), it does not matter which order
they are connected.
Connect each earth lead from each light module to
the earth connectors.
Figure D Figure E
Figure F
Mains Power Lead
Motor Power
Lead
White Power Lead,
connects to position 1.
Position 1
Earth
connectors
A
Power plug
Earth
connector
To main isolation
switch
The main unit will have
a isloation switch lead,
plug it into control
module
Loading ...
Loading ...
Loading ...