Loading ...
Loading ...
Loading ...
5
66.5
6.6
C
B
A
L
D
D
D
E
K
M
B
H
I
Max. 20m [65ft]
1.5-2m [5-7ft]
G
F
FF
B
J
O
N
F
Max. 300mm [11-
13
/
16
in]
I
B
CD D
G
F
E
H
A
32
[1-
1
/
4
]
35
[1-
7
/
16
]
25
[1]
[Fig. 6-5-2]
[Fig. 6-5-1]
A Indoor unit
B Tie band (accessory)
C Visible part
D Insertion margin
E Drain hose (accessory)
F Drain pipe (O.D. ø32 mm [1-1/4 in] PVC TUBE, field supply)
G Insulating material (field supply)
H Tie band (accessory)
I To be gap free. The joint section of the insulation material meet must be at the top.
Correct piping
Wrong piping
A Insulation (9 mm [3/8 in] or more)
B Downward slope (1/100 or more)
C Support metal
K Air bleeder
L Raised
M Odor trap
Grouped piping
D O. D. ø32 mm [1-1/4 in] PVC TUBE
E Make it as large as possible. About 10 cm [3-15/16 in].
F Indoor unit
G Make the piping size large for grouped piping.
H Downward slope (1/100 or more)
I O. D. ø38 mm [1-1/2 in] PVC TUBE for grouped piping.
(9 mm [3/8 in] or more insulation)
J Up to 700 mm [27-9/16 in]
N Drain hose (accessory)
O Horizontal or slightly upgradient
(Unit: mm [in])
A
B
F
C
D
E
[Fig. 6-6-1]
A Insert pump's end 2 to 4 cm [13/16 to 1-5/8 in].
B Remove the water supply port.
C About 2500 cc
D Water
E Filling port
F Screw
KJ79P806H01.book 5 ペー 021年12月13日 月曜日 午後2時15分
Loading ...
Loading ...
Loading ...