SUNSEEKER WBEDGERATT Wild Badger Power Edger Attachment

Product's Documents

Below are documents related to this product, you can read online or download:
WBEDGERATT photo

Installation Manual

This is the main product document for model WBEDGERATT.

The file format is pdf, 3 pages, you can download this manual here .

background
C
A E
D
Aligh the pin (C) with the hole of the shaft connector hole (E),
inset the shaft (A) to the shaft connector until the pin get into the hole(E)
and screw the knob (D) tightly.
Fig.1 Fig.2
2.Assemble the edger attachment tube to the engine tool (Fig.2)
background
Fig.3 Fig.4
(Fig.3)
ATTENTION: when working on flat ground, adjust the alignment guide board(E3) to be short,
and when working on road side with gap, adjust the alignment guide board (E3) to be longer
and fitable for tbe road gap
(Fig.4).
background
ATTENTION: when replacing parts or doing maintenance, make sure switching off the
engine until the cutting parts stop rotary.

Specifications

SUNSEEKER WBEDGERATT Questions and Answers

See other models: BCI52 MFT 26I 4IN1_POLE SAW