Loading ...
Loading ...
Loading ...
![](https://files.manualsfile.com/23037839-ds-3e1508-ei/bgd.png)
Figure 3-3 RJ45 Port Connecon
4 Powering on the Device
Please use the aached power cord in package to power on the
device.
Before powering your switch, make sure that:
•
The operang power supply is compliant with rated input
standard.
•
Port cables and grounding cables are correctly connected.
•
If there is outdoor cabling, connect a lightning rod and
lightening arrester to the cable.
Cauon
PoE power supply line and strong wire cannot be wired together,
otherwise PD equipment or switch ports will be burnt.
5 Device Management
The device can be congured and managed through iVMS-4200
soware, mainly including network parameter conguraon, port
conguraon, link aggregaon conguraon, network topology
display and so on.
Note
•
This chapter will briey introduce the device management
through the iVMS-4200 soware. For other funcons, please
refer to User Manual of iVMS-4200 Client Soware.
•
All pictures in this manual are for illustraon only, and the
specic interface is subject to the actual interface.
5.1 Acvang Devices
For the inacve devices, you are required to create a password to
acvate them before they can be added to the soware and work
properly.
Before You Start
Make sure the device to be
acvated is connected to the network
and is in the same subnet with the PC running the client.
5
Loading ...
Loading ...