Hikvision DS-C30S-S11 Video Wall Controller Casing

Installation Guide - Page 22

For DS-C30S-S11.

PDF File Manual, 28 pages, Read Online | Download pdf file

DS-C30S-S11 photo
Loading ...
Loading ...
Loading ...
Video Wall Controller Installation Guide
14
Grounding Requirements
In order to ensure personal safety and device safety, the device must be grounded. See “2.3 for
detailed steps.
Power Supply Requirements
The device supports AC 106 ~ 240 V, 50/60 Hz power supply. It is recommended to use AC 220
V power supply. To ensure the stable operation of the device, it is recommended to install UPS
for power supply.
Anti-Interference Requirements
The on-site power supply system must have effective measures to prevent grid
interference.
Do not use the working ground together with the grounding device or lightning
protection grounding device of power equipment, and keep the two as far away as
possible.
Keep away from high-power radio transmitters, radar transmitters, and high-frequency
and high-current equipment.
When necessary, electromagnetic shielding can be used for anti-interference.
Environmental Requirements
The device is a system-level monitoring equipment, which is generally placed in the central
computer room of the monitoring system at all levels. The selection of the installation site
should comply with the relevant standards of the computer room construction in the country
and region of use.
The device is a standard rack-mounted equipment fixed in the cabinet. Please pay attention to
the following information during installation and use:
Ensure that the temperature in the cabinet is within the range of 0 °C to 50 °C .
Ensure that the humidity in the equipment room is between 10% and 90% RH.
Ensure that the cabinet is strong enough to support the weight of the video integrated
platform and its accessories. Pay attention to avoid the danger caused by uneven
mechanical load during the simultaneous installation.
Ensure that there is enough installation space for the video and audio cables. The cable
bending radius should not be less than 5 times the cable outer diameter.
Keep the integrated platform a minimum 50 cm distance above the ground for sufficient
ventilation.
Loading ...
Loading ...
Loading ...