Hoshizaki KM901MRJ KM-901MRJ 30" Energy Star Ice Modular with 950 lbs. Daily Ice Production, Remote Cooled, H-Guard Plus, Phase 1, and CycleSaver Design, in Stainless Steel

Instruction Manual - Page 36

For KM901MRJ.

PDF File Manual, 41 pages, Read Online | Download pdf file

KM901MRJ photo
Loading ...
Loading ...
Loading ...
36
Sanitizing
14) To ll the water tank, turn the cleaning valve to the right until completely horizontal
(closed). Move the control switch to the "ICE" position, then replace the front panel. After
3.5 min., remove the front panel, then move the control switch to the "OFF" position.
15) Remove the front insulation panel, then pour 1.7 . oz. (50 ml) of an 8.25% sodium
hypochlorite solution (chlorine bleach) into the water tank. Replace the front insulation
panel. Turn the cleaning valve to the left until completely vertical (open). IMPORTANT!
Use regular bleach with no additives. Using a bleach with additives causes
excessive foaming during sanitizing, reducing the effectiveness of sanitizing.
16) NOTICE! To avoid excessive foaming, wait 1 min. before proceeding.
After 1 min., move the control switch to the "WASH" position, then replace the front
panel.
17) After 45 min., remove the front panel, then move the control switch to the "OFF"
position.
18) Remove the front insulation panel, then slide the cube guide to the right. Remove the
rubber cap and sleeve covering the overow pipe. Unscrew the overow pipe. After the
water tank has drained, reconnect the overow pipe. Replace the rubber cap, sleeve,
cube guide, and front insulation panel.
Sanitizing Rinse 1
19) Turn the cleaning valve to the right until completely horizontal (closed). Move the control
switch to the "ICE" position, then replace the front panel. After 3.5 min., remove the front
panel, then move the control switch to the "OFF" position.
20) Turn the cleaning valve to the left until completely vertical (open). Move the control
switch to the "WASH" position, then replace the front panel. After 5 min., remove the
front panel, then move the control switch to the "OFF" position.
21) Remove the front insulation panel, then slide the cube guide to the right. Remove the
rubber cap and sleeve covering the overow pipe. Unscrew the overow pipe. After the
water tank has drained, reconnect the overow pipe. Replace the rubber cap, sleeve,
cube guide, and front insulation panel.
Sanitizing Rinse 2
22) Turn the cleaning valve to the right until completely horizontal (closed). Move the control
switch to the "ICE" position, then replace the front panel. After 3.5 min., remove the front
panel, then move the control switch to the "OFF" position.
23) Turn the cleaning valve to the left until completely vertical (open). Move the control
switch to the "WASH" position, then replace the front panel. After 5 min., remove the
front panel, then move the control switch to the "OFF" position.
24) Remove the front insulation panel, then slide the cube guide to the right. Remove the
rubber cap and sleeve covering the overow pipe. Unscrew the overow pipe. After the
water tank has drained, reconnect the overow pipe. Replace the rubber cap, sleeve,
cube guide, and front insulation panel.
Loading ...
Loading ...
Loading ...