Hoshizaki KM901MRJ KM-901MRJ 30" Energy Star Ice Modular with 950 lbs. Daily Ice Production, Remote Cooled, H-Guard Plus, Phase 1, and CycleSaver Design, in Stainless Steel

Instruction Manual - Page 35

For KM901MRJ.

PDF File Manual, 41 pages, Read Online | Download pdf file

KM901MRJ photo
Loading ...
Loading ...
Loading ...
35
Cleaning
4) Remove the front insulation panel, then slide the cube guide to the right. Remove the
rubber cap and sleeve covering the overow pipe. See Fig. 16. Unscrew the overow
pipe. After the water tank has drained, reconnect the overow pipe. Replace the rubber
cap, sleeve, cube guide, and front insulation panel. NOTICE! Make sure the O-ring is
attached to the bottom of the overow pipe and be careful not to cross thread the
overow pipe.
5) To ll the water tank, move the control switch to the "ICE" position, then replace the front
panel. After 3.5 min., remove the front panel, then move the control switch to the "OFF"
position.
6) Remove the front insulation panel, then pour 30 . oz. (887 ml) of Hoshizaki "Scale
Away" into the water tank. Replace the front insulation panel. Turn the cleaning valve to
the left until completely vertical (open).
7) NOTICE! To avoid excessive foaming, wait 1min. before proceeding.
After 1 min., move the control switch to the "WASH" position, then replace the front
panel.
8) After 30 min., remove the front panel, then move the control switch to the "OFF"
position.
9) Remove the front insulation panel, then slide the cube guide to the right. Remove the
rubber cap and sleeve covering the overow pipe. Unscrew the overow pipe. After the
water tank has drained, reconnect the overow pipe. Replace the rubber cap, sleeve,
cube guide, and front insulation panel.
10) In bad or severe water conditions, turn off the power supply, then remove, clean
(cleaning solution = 5 oz. Hoshizaki "Scale Away" per gallon of warm water), rinse,
and replace the cube guides, oat switch, water supply tubes, spray tubes, and spray
guides; turn on the power supply when complete. Otherwise, continue to step 11..
Cleaning Rinse
11) Turn the cleaning valve to the right until completely horizontal (closed). Move the control
switch to the "ICE" position, then replace the front panel. After 3.5 min., remove the front
panel, then move the control switch to the "OFF" position. Note: The icemaker will not
operate unless the cleaning valve is completely closed.
12) Turn the cleaning valve to the left until completely vertical (open). Move the control
switch to the "WASH" position, then replace the front panel. After 5 min., remove the
front panel, then move the control switch to the "OFF" position.
13) Remove the front insulation panel, then slide the cube guide to the right. Remove the
rubber cap and sleeve covering the overow pipe. Unscrew the overow pipe. After the
water tank has drained, reconnect the overow pipe. Replace the rubber cap, sleeve,
cube guide, and front insulation panel.
Loading ...
Loading ...
Loading ...