JET HBS-1321W , 13" x 21" Semi-Auto Horizontal Bandsaw

Manual - Page 6

For HBS-1321W.

PDF File Manual, 24 pages, Read Online | Download pdf file

HBS-1321W photo
Loading ...
Loading ...
Loading ...
6
5.0 Uncrating and cleanup
1. Read and understand the entire manual before
attempting setup or operation.
2. Finish uncrating the saw and inspect for
damage. If any damage has occurred, contact
your local distributor.
3. Remove all bolts attaching machine to
shipping base.
4. Leave packing material between vice clamps
and saw head intact until band saw has been
lifted to its final position.
5. Clean all rust protected surfaces with kerosene
or diesel oil to remove protective coating. Do
not use gasoline, paint thinner, mineral spirits,
etc. These may damage painted surfaces.
6. Lubricate all slideways with a light film of Mobil
DTE Oil Heavy Medium.
6.0 Installation
For best performance, the band saw should be
located on a solid and level foundation. Allow room
for servicing and for moving large stock around the
band saw when deciding a location for the
machine.
1. Using lifting straps of adequate lifting capacity,
which are isolated from the band saw's
finished surfaces, lift machine and place in
desired location. See Figure 1 for strap
placement.
2. Install four leveling bolts with lock nuts on both
sides of the base.
3. Place a level on the bed surface and check
side to side and front to back.
4. Adjust leveling screws until machine is level in
both directions and tighten locking nuts.
Figure 1
7.0 Assembly
1. Insert stop rod (A, Figure 2) into the base
below the vise. Place stop bracket (B) onto
stop rod and tighten lock knob (C). Attach the
connecting plate (D) to stop bracket with hex
cap bolt and washer (E), and tighten. Attach
the work stop (F) to the connecting plate with
lock handle (G), and tighten.
Figure 2
2. Slide the tensioning handle (A, Figure 3) onto
the shaft and tighten the hex socket set screw.
Figure 3
Loading ...
Loading ...
Loading ...