Melitta E950-103 E 950-103 Pressure Coffee Maker

Operating Instructions - Page 11

For E950-103.

PDF File Manual, 15 pages, Read Online | Download pdf file

E950-103 photo
Loading ...
Loading ...
Loading ...
22
Descaling phase 2 ( ):
When illuminates, proceed as follows:
Empty and reinsert the drip tray.
Rinse the water reservoir thoroughly.
Fill the water reservoir with tap water up
to the max. mark.
Insert the water reservoir.
Press the button to continue with the
descaling programme (takes about 5
minutes).
Descaling phase 3 ( ):
When illuminates, proceed as follows:
Empty the drip tray and reinsert it.
When is illuminated, the descaling
programme is nished.
Insert the water lter if necessary
("Water hardness and lter", page 18).
Other settings
Energy-saving mode
After the last action, the appliance
switches automatically (depending on the
settings) to the energy-saving mode. The
appliance is set to 5 minutes in the
factory.
Switch on the appliance.
Press the and buttons
simultaneously until ashes.
Press the button twice.
illuminates.
Press the button until one of the four
times is set. The time is displayed by the
beans on display 9.
Display Time
5 minutes
(factory setting)
15 minutes
30 minutes
ashing
Off
Press the button to conrm the
setting.
Auto-OFF function
The appliance switches off automatically
after the last action (depending on the
setting). From the factory, the appliance is
set at 30 minutes .
Switch on the appliance.
Press the and buttons
simultaneously until ashes.
Press the button three times.
illuminates.
Press the button until one of the
four switch-off times is set. The time is
displayed by the beans on display 9.
Display Time
30 minutes
(factory setting)
2 hours
4 hours
ashing
8 hours
Press the button to conrm the
setting.
BA_Solo_082016.indd 22 21.09.2016 07:23:53
Loading ...
Loading ...
Loading ...