True Appliances STG1F-1S-HC Reach-In Freezer

INSTALLATION MANUAL - Page 6

For STG1F-1S-HC. Series: STR, STA & STG

PDF File Manual, 27 pages, Read Online | Download pdf file

STG1F-1S-HC photo
Loading ...
Loading ...
Loading ...
5
TRUE
SPEC SERIES: STR, STA & STG
www.truemfg.com
LOCATING
1. Make sure unit is as close to the final location as possible.
2. Remove the shipping bolts located at the bottom of the
wooden skid.
3. Carefully slide the unit off the wooden skid. Slide packing
material underneath the side of the unit hanging off the skid.
Then install castors or legs for that side of the unit.
4. Then carefully slide the other side of the unit off one corner
at a time while installing castors or legs for each corner. Use
packing material for under each corner of the unit before
installing a castor or leg.
INSTALLATION OF CASTORS OR
OPTIONAL LEGS
Important Safeguard for installation of leg/castor. Images 1-5 demon-
strate procedure.
SECURING CASTORS AND LEGS
To obtain maximum strength and stability of the unit, it is important
that you make sure each castor is secure. Optional legs are hand-
tightened securely against the lower rail assembly. The bearing race
on the castor or the top edge of the leg must make firm contact
with the rail.
LEVELING SHIMS
Four leveling shims have been provided for leveling castored units
positioned on uneven floors. Shims must be positioned between rail
end and bearing race.
A. Turn the bearing race counter-clockwise until the cabinet is
level. Level front to back and side to side. (diagonally)
B. Install the desired number of shims, making sure the slot of the
shim is in contact with the threaded stem of the castor.
C. If more than one shim is used, turn the slot at a 90° angle so
they are not in line.
D. Turn the bearing race clockwise to tighten and secure the
castor by tightening the anchoring bolt with a 3/4 inch open-
end wrench or the tool provided.
CAUTION: TO AVOID DAMAGE TO LOWER RAIL
ASSEMBLY, SLOWLY RAISE UNIT TO UPRIGHT
POSITION.
NOTE: OPEN HOLES LOCATED ON THE CROSS
MEMBERS OF THE FRAME RAIL SHOULD BE
PLUGGED BEFORE UNIT IS IN USE.
Removing shipping bolts
Slide packing material under the unit.
1
Anchor castor.
2
Thread leg into cabinet bottom
cabinet.
3
The end of the leg is adjustable for
easy leveling.
4
Castor with leveling shims.
5
Loading ...
Loading ...
Loading ...