V-Tac VT-204100-B 20kWh Lithium Battery System 8000 Cycles

INSTRUCTION MANUAL - Page 20

For VT-204100-B. Series: ESS SERIES

PDF File Manual, 33 pages, Read Online | Download pdf file

VT-204100-B photo
Loading ...
Loading ...
Loading ...
Copyright © Vestwoods Technology Co., Ltd. 22
4.2.3 Unpacking Acceptance
After receiving the goods on-site, please check whether the packing box is intact and inspect the goods
in time. If the packing box is slightly damaged, please sign and confirm the goods list and indicate the
extent of the damage. If the damage is severe, please refuse to sign.
Please carry out an unpacking inspection after receiving all the goods. If users find that the received
goods do not match the packing list, please contact Vestwoods as soon as possible.
4.3 Installing Battery Cabinet
Context
Before installing the battery cabinet, users need to plan the installation site. The installation site should
comply with the following conditions:
The installation site should be able to place one battery cabinet, and there should be a wall to
mount the inverter.
A 500 mm ventilation and operation space should be reserved at the right of the battery cabinet.
If possible, the installation site should be as spacious and ventilated as possible. If the site is small
and confined, please configure auxiliary heat dissipation equipment.
Procedure
The battery cabinet is heavy. If possible, please use tools to assist in handling and installation.
1 Plan the installation position of the battery cabinet according to the actual situation of the site.
2 Fixing the chassis base with the battery box 1, using 8 pcs M5*12 screws. (It has been pre-installed
before delivery
Figure 15. Fixing the chassis base of the battery box
Loading ...
Loading ...
Loading ...