Waldorf BPL8120GE 800 Series 1200mm Gas Tilting Bratt Pan Low Back Version

Installation Operation Manual - Page 26

For BPL8120GE.

PDF File Manual, 32 pages, Read Online | Download pdf file

BPL8120GE photo
Loading ...
Loading ...
Loading ...
24
NOTE:
These conversions should only be carried out by qualified persons. All connections
must be checked for leaks before re-commissioning appliance.
Adjustment of components that have adjustments / settings sealed (e.g. paint
sealed) should only be adjusted in accordance with the following instructions and
should be re-sealed before re-commissioning this appliance.
For all relevant gas specifications refer to the table at rear of this section.
Carry out the following actions:-
Remove hand wheel (with pan in lowered position)
BP8080G & BP8120G models only).
Remove gas and water control knobs.
Remove front control panel.
Remove large front right hand cover panel.
1. Refit hand wheel to allow pan to be raised / lowered during
gas conversion procedure. (BP8080G & BP8120G models
only).
2. Remove main burner injectors and replace with correct size
injectors as shown in Gas Specification Tablesat rear of
this section.
3. Ensure aeration sleeve is adjusted to measurements shown
in Gas Specification Tables’.
1. Disconnect the following:-
Pilot supply gas tube to pilot burner.
2. Remove pilot injector and replace with correct size injector
as shown in Gas Specificationtable at rear of this section.
3. Refit the following:-
Pilot supply tube to pilot burner.
Lower bratt pan, (BP8080G & BP8120G models
only).
Refit large front right hand cover panel.
Refit front control panel.
Refit gas and water control knobs.
Pilot Burner
Piezo Igniter
Thermocouple
Pilot Supply
Tube
H
Aeration Sleeve
Clamp Screw
Loading ...
Loading ...
Loading ...