Loading ...
Loading ...
Loading ...
Installation Instructions (cont'd)
VENTING SYSTEM EXAMPLE INSTALLATIONS
FOR ALL MODELS (cont'd)
i - .
2. Horizontal runs require a minimum ¼ rise per foot.
7-
13"HIN.
l
35' MAX.
1
3. A vertical run can be no more than 20'.
4. The total vertical and horizontal run cannot exceed 35'.
37
MIN. RISE¼"
PERFOOT
ONE ELBOW
MAX. 20'
TOTAL VERTICAL AND
HORIZONTAL RUNS
CANNOT EXCEED 35'
I 1
MAX. 20'
MIN. RISE ¼"
PER FOOT
MIN. RiSE ¼"
PER FOOT
TOTAL VERTICAL AND
HORIZONTAL RUNS
CANNOT EXCEED 35'
17
CEMENTING PVC,ABS OR CPVC PIPEAND FITTINGS
Read and observe all safety information printed on primer,
cleaner, and cement containers.
DANGER
Primer, cleaner, and cements are extremely flammable.
They are harmful or fatal if swallowed. The vapors are
harmful. They may irritate eyes and skin and can be
absorbed through the skin.
PRECAUTIONS
Always store primers, cleaner, and cements in cool, dry,
well ventilated places. Do not store them near heat,
sparks, or flames. Keep containers closed. Use them in
well ventilated areas. Wear impervious clothing while
handling. Do not smoke, eat, or drink while handling.
Wash thoroughly after handling and before eating. Wear
eye protection when handling. If swallowed, drink water,
do not induce vomiting, and call a physician or poison
control center immediately. If inhaled, get fresh air and
seek medical attention if ill feelings persist. In case of
eye and skin contact, immediately flush with plenty of
water for 15 minutes and seek medical attention if irri-
tation persists. KEEP OUT OR REACH OF CHILDREN.
All primers, cleaners, and cements must meet all local codes and
applicable standards of the American Society For Testing
Materials Standards.
Before using primers, cleaners, and cements, stir or shake, mak-
in sure contents are liquid. Do not use if found to be lumpy or
jelly-like.
1. Cut pipe ends squarely removing all burrs and dirt.
2. Dry fit pipe and fittings to be connected for proper fit.
3. Clean pipe and fitting with a primer/deaner.
4. Apply a thin coat of cement to fitting, avoiding puddling
inside.
5. Apply a liberal coat of cement to pipe leaving no voids.
6. QUICKLY assemble parts while cement is flui!! If you wait
too long, re-coat pipes.
7. Push pipe completely into socket of fitting, turning as it goes
until _tnottoms.
8. Hold pipe and fitting together for 30 seconds. Then carefully
clean off excess with a cloth. Allow connections a sufficient
time to cure before disturbing.
9. Remember that vent pipes must be adequately and securely
supported.
APPROXIMATE SETTING TIME FOR 2½" TO 4" PIPE
OINTS
90°F to 150°F
50°F to 90°F
O°F to 50°F
MOVEMENT
OF JOINT
hr.
1 hr.
IX hr.
COMPLETE
SET
8 hrs.
15 hrs.
18 hrs.
Loading ...
Loading ...
Loading ...