Initial Setup
2. Connect the tank ll (black) hose to the liquid connector
on the source tank.
3. Open the source tank valve.
4. Position the source tank in such a way that liquid refrigerant
is supplied to the connection.
5. Select to start the tank ll process. The machine begins
lling the internal storage vessel (ISV). Add at least 3.6 kg
of refrigerant to ensure enough is available for charging.
This process takes 15–20 minutes.
6. The machine stops when the designated amount of
refrigerant has been transferred to the ISV or when the
source tank is empty. Follow the messages on the display.
7. Close the source tank valve.
8. Select to return to the Setup Menu.
The machine is ready for operation.
Note:
• There is no need to calibrate the scale; it is calibrated at
the factory.
• After the tank ll process is complete, the display does
not show the same amount as the programmed ll level.
The display shows the amount of refrigerant that is available
for charging, which is approximately 0.67 kg (1.4 lb) less than