Sunbeam EMM2900SS Compact Barista Espresso Machine

User Guide - Page 8

For EMM2900SS. Also, The document are for others Sunbeam models: EMM2900

PDF File Manual, 36 pages, Read Online | Download pdf file

EMM2900SS photo
Loading ...
Loading ...
Loading ...
CENTRE
2.TURN
1. ALIGN
& INSERT
Everything you need to know after
unboxing your new coffee machine.
Step 1. Remove packaging
- Ensure all packaging has been removed.
Step 2. Position machine
- Ensure the machine is positioned onto a
dry, stable, flat & horizontal benchtop.
Step 3. Remove the plug at the bottom
of the water tank.
Step 4. Wash & dry parts
- Wash the parts listed below in warm
water with a mild detergent:
- Milk jug
- Tamper measuring spoon
- 1 CUP & 2 CUP dual wall filter baskets
- Water tank
- Group handle
- Rinse and allow thorough air drying.
Step 5. Preparing to prime machine
Fill water tank
- Fill the water tank with cold water
to the MAX level.
- Use filtered water for best results.
Power
- Ensure that the dial is in the OFF position.
- Insert the power plug into a 230-240V AC
power outlet and switch the power on.
- Press the STANDBY button to turn on the
machine.
- The 1 CUP, 2 CUP & STEAM buttons will
pulse to indicate the machine is heating
up.
- When the machine is ready, the STANDBY,
1 CUP, 2 CUP and STEAM buttons will
illuminate. The machine is now ready to
use.
• Insert group handle
- Insert the 2 cup filter basket in the group
handle.
- Align the group handle with the 'INSERT'
position and insert the group handle flat
against the group head. Then turn the
group handle anti-clockwise to the centre
position.
8
Let's get you started
Note: Make sure that the water tank is
clean and free of any debris, as any fine
particles can block the water flow.
Note:
Turning the group handle to the
centre position might be tight for the
first few uses.
Important: This priming step must be
completed prior to first use or if the
machine has been inactive over a long
period of time.
Loading ...
Loading ...
Loading ...