J1A7236BLXXRSW Jacuzzi

User Manual - Page 6

For J1A7236BLXXRSW.

PDF File Manual, 48 pages, Read Online | Download pdf file

J1A7236BLXXRSW photo
Loading ...
Loading ...
Loading ...
Page 6 www.jacuzzi.com Installation and Operation
English
Signature™ Collection Signature™ Collection
Optional Heater
Suboor
DANGER
Risk of electric shock. Connect only to a circuit protected by a
GFCI (Figure 2).
CAUTION
Electricaloutletmustbemounted4˝(101mm)abovetheoor
line and 12" max (305mm) inside from the edge of the bathtub
(Figure 2), or in accordance with local building and electrical
codes.
Risk of component overheat. Do not use electric extension cord
to power this unit. Operating the pump without enough water in
the bathtub can cause permanent damage to the pump/motor.
If the GFCI unit indicates a malfunction, per manufacturer’s
instructions, turn OFF power and do not attempt to use the
bathtubuntilthesourceoftheproblemhasbeenidentiedand
corrected.
Electrical Connections
Installation Procedures
Framing and Support (Cont)
1 Preparethesuboorforthedrainandensurethattheareaislevel.Thedrain/overowofthebathtubextends
belowthebottomofthebathtub.IdentifythedrawingintheTechnicalSpecicationsManualthatcorresponds
with your bathtub.
2 Jacuzzi’sTru-Level®baseisastandardfeatureonallbathtubs.Ifthesuboorislevelandacontinuoussurface,
no other preparation is necessary. Proceed to the “Installation Procedures” section.
3
Ifthesuboorisnotlevel,youmustleveltheentiresurfacepriortoinstallingthebathtub.
4 Ensurethattheoorislevelandcansupportaloadof50lbs.persquarefoot.
5 The bathtub must remain level in order for it to drain properly and must make contact with the leveling material.
NOTES
When using electrical products, basic precautions should always be followed:
Always follow local building and electrical codes. Grounding is required. The unit should be installed and grounded
byaqualiedelectrician.
A dedicated, 120VAC, 15 Amp GFCI-protected circuit is required for the pump/motor. If the bathtub was purchased
with a heater installed, a separate 120VAC, 15 Amp GFCI-protected circuit is required. Bonding lugs are provided on
the motor and heater to satisfy local electrical codes.
1
Make sure framed-in alcove is of proper size per
Jacuzzidimensions,square,andplumb;checkoor
for levelness (Figure 3). Rough-in should be kept to
a minimum until the unit is on the job site.
Measurementsmayvary+0or-⅜"fromoriginal
specications.
2 Sufcientclearancemustbeprovidedforaccess
to service connections (pump/motor, controls,
heater plumbing and electrical hook ups).
NOTE
The following steps (A, B and C) will direct you in how
best to install the bathtub, depending on your installation
environment.
4˝
(101mm)
Fig. 2
Fig. 3
Level
12˝
(305mm)
Loading ...
Loading ...
Loading ...