Loading ...
Loading ...
Loading ...
![](https://files.manualsfile.com/95658798-j1a7236blxxrsw/bg5.png)
Installation and Operation www.jacuzzi.com Page 5
English
Signature™ Collection
Framing and Support
Observe all governing codes and ordinances.
1 Properinstallationisyourresponsibility.Haveaqualiedtechnicianinstallthisbath.
2
Installation using a ground-fault circuit-interrupter (GFCI) is required.
3
It is the customer’s responsibility:
•Tocontactaqualiedelectricalinstaller.
• To assure that electrical installation is adequate and in conformance with National Electrical Code (NEC).
ATechnicalSpecicationsManualhasbeenincludedwithyourbathtub.TheTechnicalSpecicationsManualwill
containpertinentinformationregardingyourJacuzziLuxuryBathproduct.LocatetheTechnicalSpecicationsManual
at this time.
NOTES
Finished alcove must have correct interior dimensions, as shown in the rough-in diagrams in the Technical
SpecicationsManual,toproperlyinstallunit.Forthreewallalcoveinstallations,useanintegralmoldedthree-sided
tilingangebathtubs.JacuzziLuxuryBathdoesnotrecommendutilizingbathtubswithoutanintegraltilingangeinan
alcove installation where a shower head would be installed above the unit and utilized as a shower.
•Inremodeling,ifnecessary,addstudsateachendtoprovideaverticalnailingsurfaceforthesidenailingangesof
bathxtureproduct.
• To avoid obstructions during installation make sure that supply lines, spout pipe and valve plumbing do not project
into alcove.
•Bathtubsrequirea6"x12"(150mmx305mm)ooropeningforthe1½"(38mm)drain,wasteandoverow(DWO)
kit.
•Besureooropeninglocationmatchesbathtubxturedrainlocation.
• Use of casting plaster/plaster of paris (foundation material) is recommended in all commercial structures (i.e. hotels,
motels, dormitories, health clubs, etc.).
• The unit must be supported from the bottom of the bathtub and not solely from the bathtub rim.
Fig. 1
READ ALL INSTALLATION INSTRUCTIONS COMPLETELY. IMPROPER INSTALLATION WILL VOID THE
WARRANTY.
IMPORTANT
Makesurethatwallsandoorsmeetresafetyrequirementsoflocalbuildingcodeand/orFHA/HUDMinimum
Property Standards.
• Per UPC code, access must be provided to the
pump/motorforyourspecicmodel(Figure1).Itisthe
responsibility of the installer, building contractor, or
owner to provide access for service. Jacuzzi is not
responsible for any costs relating to obtaining access for
repair. The owner shall bear such costs and, if
appropriate, must seek recovery from the installer.
Primary and secondary service access locations are
shown in the rough-in diagrams contained in the
TechnicalSpecicationsManual.
• Provide adequate ventilation for cooling and supply
sufcientairforthepump/motor.Donotinsulatearound
the equipment.
(Illustrations above shown with framing exposed for clarity.)
Access Locations
Access Location
Example
Access Location
Example
Loading ...
Loading ...
Loading ...