Loading ...
Loading ...
Loading ...
4
© 2021 United States Stove Company
ASSEMBLY INSTRUCTIONS
TOOLS AND MATERIALS
You will need a drill with a 1/8” bit to install sheet metal
screws into connector pipe. A 5/16” socket/wrench or
screw driver to install the room air deector, and blower
assembly described. A 1/2” socket/wrench to install ue
collar. A non-combustible oor protector as specied in this
manual. All chimney and chimney connector components
required for your particular chimney installation. For
mobile homes see the “For Use In Mobile Homes” section
of this manual.
BLOWER ASSEMBLY
The blower assembly must be disconnected from
the source of electrical supply before attempting the
installation. The blower assembly is intended for use only
with a stove that is marked to indicate such use. Do not
route the supply cord near or across hot surfaces! Fix the
assembly to the back of the stove with the four screws
provided.
ASH PAN ASSEMBLY
Remove ash pan from rebox. Under the rebox, there are
two brackets; Slide the ash pan into these brackets.
FLUE COLLAR ASSEMBLY
Mount the ue collar to the top of the unit as shown using
the (3) 5/16-18 x 1-1/2 bolts, (3) washers, and (3) weld
tabs provided in the parts box.
5/6-8 x 1-1/2 BOLT
WASHER
GASKET
HEATER TOP
WELD TAB
FOR CUSTOMER SERVICE CALL: 800-750-2723 EXT 5050
Loading ...
Loading ...
Loading ...