Rheem 874T16PF 16L LPG Continuous Flow Hot Water System

User Manual - Page 60

For 874T16PF.

PDF File Manual, 88 pages, Read Online | Download pdf file

874T16PF photo
Loading ...
Loading ...
Loading ...
CONNECTIONS PLUMBING
60
IN-SERIES BOOSTER
The pipe work between the solar storage tank (if one is installed) and the in-series gas booster has a minimum
recommended pipe size of DN20, MUST BE of copper and be fully insulated with a closed cell type insulation
or equivalent in accordance with the requirements of AS/NZS 3500.4.
The insulation must be weatherproof and UV resistant if exposed. The insulation must be fitted up to the
connections on both the solar storage tank and the in-series gas booster. A full flow isolation valve must be
installed on the water line to the in-series gas booster.
GAS INLET
The gas connection is made at the underside of the water heater. The pipe work must be cleared of foreign
matter before connection and purged before attempting to operate the water heater. An isolation valve and
disconnection union must be installed to allow servicing and removal of the water heater (refer to the
diagram
on page 59).
Note: Refer to the Gas Installations Standard AS 5601 or AS/NZS 5601.1 for the correct method of sizing the
gas supply pipe to the water heater. The pipe size selection must take into account the high gas input of this
water heater (refer to table on page 54) as well as all of the other gas appliances in the premises.
Warning: Always isolate the water heater before pressure testing the gas supply system. Disconnect the
water heater after the isolation valve to prevent the risk of serious damage to the gas control. The Rheem
warranty does not cover damage of any nature resulting from failure to observe this precaution. Refer to rating
label for gas types and pressures.
Loading ...
Loading ...
Loading ...