Weil-McLain SVF 2000 Stainless Vertical Firetube (SVF) Boilers

User Manual - Page 15

For SVF 2000. Series: Series 1
Also, The document are for others Weil-McLain models: 1500, 3000

PDF File Manual, 68 pages, Read Online | Download pdf file

Loading ...
Loading ...
Loading ...
Part number 550-100-252/0520
– 15 –
Fast-Track Setup — The WIZARD (continued)
SVF WI ZARD
## OF ##
LOCAL
-
NETWORK
SW I T CH I NG T I ME S
LP1 MAX ON T IME : ###M
|
|
NET MIN ON T IME : ###M
NET MAX ON T IME : ###M
|
|
LP2 MIN ON T IME : ###M
NEXT STEP HELP
BACK SELECT ED I T
The timings set on this screen prevent the boiler
from operating too long on one demand if
another demand is present. They also prevent
short cycling on a demand.
LP1 and LP2 are times for local priorities.
MIN NET ON TIME and MAX NET ON TIME
are the maximum and minimum times this
boiler will dedicate to a call from a network
demand.
SVF WI ZARD
## OF ##
BO I LER SEQUENC I NG
SEQUENCE TYPE :
SMAR T
BASERATE HIGH : ###%
BASERATE LOW: ###%
LEAD BO I LER ROTATE :
I NCREMENTAL HOURS
ROTATE FREQ : ##DAYS
FORCE LEAD ROTATE :YES
NEXT STEP
HELP
BACK SELECT NEXT
Use this screen to set how boilers are sequenced
and how usage is rotated between boilers on
the network.
For a complete explanation of sequencing and
rotation, see page 58 and page 59.
Sequencing means the way in which boiler
firing rate is controlled as boilers are turned on
and off by the master boiler.
Three SEQUENCE TYPES are available:
SERIES sequencing allows each boiler to
reach full input before bringing on the next
boiler in sequence. PARALLEL sequencing
uses a limiter, called BASERATE HIGH, to
limit the firing rate before adding additional
boilers. SMART sequencing (factory default
setting) uses a low firing rate setting, called
BASERATE LOW, to keep boilers at a low
firing rate, bringing on additional boilers at
reduced rate until all boilers are on if neces-
sary. Boilers are then allowed to modulate to-
gether as high as necessary to meet demand.
Rotation means how and how often the boiler
firing order is changed.
LEAD BOILER ROTATE options are
based on how long a boiler has operated. Se-
lect either OFF, BY BOILER ID, TOTAL
HOURS or INCREMENTAL HOURS.
See detailed explanation of options on
page 58.
Use the ROTATE FREQ setting to control
how often the rotation sequence is changed.
FORCE LEAD ROTATE – If set to YES,
then when the frequency timer expires and
the new order is calculated, this forces the
new boiler order to take effect while a heat
demand is currently active.
SVF WI ZARD
## OF ##
SET DATE & T IME
TIME: HH:MM AM
DAT E : MM/ DD / YY
BACK SELECT NEXT
This screen appears ONLY on the master boiler,
not on shadow boilers.
Set the time and date to ensure that control
logs accurately record time/date of occurrences.
Time and date information is provided to the
shadow boilers by the master boiler.
SVF WIZARD
## OF ##
MA I NT ENANCE I NFO
NAME :################
PHONE :###-###-####
MODEL :####### ###-##
CP# :##########
INSTALLED: DD/MM/YY
LAST DATE : DD/MM/ YY
NEXT DA T E : DD /MM/ YY
INTERVA L SET : 12MONTHS
WI ZARD COMPLETE
HELP
BACK SE LECT NEXT
Use this screen to enter relevant data about the
installer and boiler.
See Figure 47, page 67 for full explanation of
the inputs on this menu.
SVF
Series 1
COMMERCIAL CONDENSING GAS-FIRED WAT ER BOILER
Advanced Manual
Loading ...
Loading ...
Loading ...