TR009 US Stove

User Manual - Page 20

For TR009.

PDF File Manual, 24 pages, Read Online | Download pdf file

TR009 photo
Loading ...
Loading ...
Loading ...
Page 20 / TR009 PERFORMER™ VGZ-029 / 20120113.0
WIRING DIAGRAM - MODEL F-6 BLOWER OPTION
DOOR GASKET REPLACEMENT
CAUTION: DO NOT OPERATE A STOVE THAT IS
MISSING DOOR GASKET MATERIAL. OVER FIR-
ING AND UNSAFE OPERATING CONDITIONS
MAY RESULT.
PROCEDURE:
1. Ensure appliance is not in operation and is thor-
oughly cooled.
2. Remove old door gasket and clean channel.
3. Using an approved, high temperature gasket
cement, apply a thin coat in bottom of channel.
4. Starting at hinge side of door, work gasket into
channel around door unit, end butt and trim to
length.
5. Close door and allow three to four hours for cement
to set before firing appliance.
NOTICE: ANY REPLACE-
MENT WIRING MUST HAVE
EQUIVALENT INSULA-
TION AND TEMPERATURE
RATING (105°C).
CAUTION: MOVING PARTS CAN CAUSE
INJURY. DO NOT OPERATE WITH COVER
REMOVED.
DANGER: SHOCK HAZARD. DISCONNECT
POWER SOURCE BEFORE INSTALLATION
AND WHENEVER SERVICING BLOWER
ASSEMBLY.
Loading ...
Loading ...
Loading ...