Loading ...
Loading ...
Loading ...
Installation Instructions
ELECTRICAL REQUIREMENTS
Read these instructions completely
and carefully.
-A WARNI NG--TOREDUCETHERISKOF
FIRE,ELECTRICALSHOCKAND PERSONALINJURY:
DO NOTUSEAN EXTENSIONCORDORAN ADAPTER
PLUGWITH THISAPPLIANCE.
Washer must be electrically grounded in accordance
with local codes and ordinances, or in the absence
of local codes, in accordance with the NATIONAL
ELECTRICALCODE,ANSI/NFPANO.70.
CIRCUIT- Individual, properly polarized and grounded
15-amp branch circuit fused with 15-amp time-delay fuse
or circuit breaker.
POWERSUPPLY- 2-wire, with ground, 120-volt,
single-phase, 60-Hz,Alternating Current.
OUTLETRECEPTACLE-Properly _
grounded 3-prong receptacle to be
located so the power supply cord
is accessiblewhen the washer is
inan installed position.
GROUNDING REQUIREMENTS
-& WARNING: Improper connectionofthe
equipment grounding conductor can result in a risk
of electrical shock. Checkwith a licensedelectrician
if you are in doubt as to whether the appliance is
properly grounded.
,
The washer MUSTbe grounded. In the event of
malfunction or breakdown, grounding will reduce
the riskof electrical shock by providing a path of least
resistancefor electrical current.
.
Sinceyour washer is equipped with a power supply
cord having an equipment-grounding conductor and
a grounding plug, the plug MUSTbe plugged into an
appropriate, copper-wired receptaclethat is properly
installedand grounded in accordance with all local
codes and ordinances or in the absence of local codes,
with the National ElectricalCodes,ANSI/NFPA70 (latest
edition).If in doubt, call a licensedelectrician. DO NOT
cut off or alter the grounding prong on the power supply
cord. Insituations where a two-slot receptacle is present,
it isthe owner's responsibilityto have a licensed
electrician replace it with a properly grounded
three-prong grounding-type receptacle.
WATER SUPPLY REQUIREMENTS
Hot and cold water faucets MUSTbe installedwithin
42 inches (107 cm) of your washer's water inlet. The faucets
MUSTbe 3/4" (1.9cm) garden hose-type so inlet hoses can
be connected. Water pressure MUSTbe between 10and 120
pounds per square inch. Your water department can advise
you of your water pressure.The hot water temperature
should be set to deliver water at 120° to 140°F(48°-60°C)
to provide proper Automatic Temperature Control (ATC)
performance.
NOTE:A water softener is recommended to reduce buildup
of scale inside the steam generator if the home water supply
is very hard.
DRAIN REQUIREMENTS
i. Drain capable of eliminating 17gals (64.3 L)
per minute.
2. A standpipe diameter of i 1/4" (3.18cm) minimum.
3. The standpipe height above the floor should be:
Minimum height: 24" (61 cm)
Maximum height:96" (244cm)
BACK
1
T
96"
(244 cm)
Max.
24"
(61 cm)
Min.
NOTE:The drain hose attached to the washer can reach
a 58" (147 cm) high standpipe. Fora higher standpipe,
contact an authorized parts distributor.
19
Loading ...
Loading ...
Loading ...