Craftsman 13953902D garage door opener

User Manual - Page 13

For 13953902D.

PDF File Manual, 76 pages, Download pdf file

Loading ...
Loading ...
Loading ...
INSTALLATION STEP 2
Install the Header Bracket
You can attach the headerbracket either to the wall above the
garagedoor, or to the ceiling. Follow the instructions which will
work bestfor your particular requirements. Do not install the
header bracket overdrywall. If installing into masonry, use
concreteanchors(not provided).
WALLHEADERBRACKETINSTALLATION
* Center the bracket on the vertical centerline with the bottom
edge of the bracket on the horizontal line as shown (with the
arrow pointing toward the ceiling).
Mark the vertical set of bracket holes (do not use the holes
designatedfor ceiling mount). Drill 3/16" pilot holes and fasten
the bracket securely to a structural support with the hardware
provided.
HARDWARESHOWN ACTUALSIZE
Lag Screw
5/16"-9xl -5/8"
Wall Mounting Holes
Optional
Wall Mounting Holes
Header
_iiiiiiiSJiii_iiiiiii/iiiiiiii
2x4
Structural
Support_
d"
Horizontal
Line _, _ j
I
J
Highest Point of _,_
Garage Door Travel
The nail hole is for
positioning only.
You must use lag screws
to mount the header bracket.
Garage Door
CEILINGHEADERBRACKETINSTALLATION
Extend the vertical centerline onto the ceiling as shown.
Center the bracket on the vertical mark, no more than
6" (15 cm) from the wall. Make sure the arrow is pointing
toward the wall. The bracket can be mounted flush against the
ceiling when clearanceis minimal.
Mark the side holes. Drill 3/16" pilot holes and fasten bracket
securely to a structural support with the hardware provided.
Ceiling Mounting Holes
Finished
Ceiling
_
Vertical
t / _ _Header Centerline
_ Bracket : Garage Door
6" (15 cm)
Maximum
Door
S
Lag Screws
5/16"-9xl -5/8"
The nail hole is for
positioning only.
You must use lag screws
to mount the header bracket.
of Garage Door
Header Wall
13
Loading ...
Loading ...
Loading ...