Owner’s Manual - Page 5

For 229965370. Also, The document are for others Kenmore models: 229.965520, 229.965530, 229.965540, 229.965550, 229.965560, 229.965570, 229.965320, 229.965330, 229.965340, 229.965350, 229.965360, 229.965370

Loading ...
Loading ...
Loading ...
Checktobesureyouhavetherightsizeboilerbefore
startinatheinstallation.Seeratingandcapacitytable
onpreviouspage.Also besurethenewboilerisfor
the type of gas you are using. Check the rating
plate onthe rightside of the boiler.
You must see that the boiler is suppliedwith the
correcttypeofgas,fresh airfor combustion,and a
suitable electrical supply. Also, the boiler must be
connected to a suitable chimney or horizontal venting
system and an adequate piping system. Finally, a
thermostat, properly located, is needed for control
of the heating system. If you have any doubts as to
the various requirements, check with localauthorities
and obtain professional help where needed. Take
the time to complete all of the steps for SAFE and
PROPER operation of the heating system.
Were required by the authority having jurisdiction,
the installation must conform toAmerican Society
of Mechanical Engineers Safety Code for Controls
and Safety Devices for Automatically Fired
Boilers, No. CSD-I*
The installation must conform to the requirements
of the authority having jurisdiction or, in the
absence of such requirements, to the National
Fuel Gas Code, ANSI Z223. l-latest revision.
The following steps are all necessary for proper
installation and safe operation of your boiler.
1. LOCATING THE BOILER
2. FRESH AIR FOR COMBUSTION
3. SYSTEM PIPING
4. CHIMNEY & VENT PIPE CONNECTION
5. GAS SUPPLY PIPING
6. ELECTRICAL WIRING
7. CHECKING &ADJUSTING
I
KEEP BOILERAREA CLEAN AND FREE FROM COMBUSTIBLE MATERIALS, GASOLINE I
AND OTHER FLAMMABLE VAPORS AND LIQUIDS
I
Loading ...
Loading ...
Loading ...