Loading ...
Loading ...
Loading ...
Installation Instructions
1_ CONNECT WATER SUPPLY
Check to make sure that Master Power
switch is in the O (OFF) position.
_wR_ Water Supply
• Locate and bring tubing to the front of the
cabinet.
• Turn the water on to flush debris from line.
Run about a quart of water through tubing
into a bucket, then shut off water.
Copper Tubin 9
• Slip a 114" nut and ferrule onto end of
copper tubing. Insert tube into the union
fitting on the unit and tighten nut to union,
• Turn on the water to check for leaks.
Note: Make sure excess tubing length does
not interfere with toekick installation.
TURN ON THE POWER
• Set the Master Power switch to the I (ON)
position,
• Check to make sure power to refrigerator is
on by opening refrigerator door to see if
interior lights are on.
Master
Powerswtch /
• The temperature controls are preset at 37 °
for the Fresh Food section and 0 ° for the
Freezer section.
• Allow 24 hours to stabilize before making
adjustments.
• Dispense water for 2 minutes to remove
trapped air from the water system.
35
Loading ...
Loading ...
Loading ...