Loading ...
Loading ...
Loading ...
nsta ation instructions FIE
tmportand
Aft connections must be checked for leaks.
o if unsure of connection process end/or leaks then contact your Iocalplumber to instafl end check
the system for you.
Ensure white 5 mm (ΒΌ") tubing is routed away from sharp objects, sharp corners (beware of
kinking tube as this will stop water flow), clear of the refrigerator unit compartment and not in a
location where it can be squashed.
Ensure all push-fit connections are firmly pushed into piece. The tube should push in 20 mm (_")
before reaching the stop.
if tubing is removed at any point, re-cut the end and reqnsert. Tubing must be fully inserted to
avoid leaks.
To remove tube from connection points, turn off the isolating tap, push in the toilet and gently
pull tubing at the same time.
i .lOConnec ionto
9
System tested and certifiedby NSF InternationalagainstNSF/ANSI Standard 53 forthe reduction
of Asbestos,Atrazine,Benzene,Cyst,Carbofuran,Lead,Lindane,Mercury,P-Dichlorobenzene,
Toxaphene &Turbidity;againstStandard NSF/ANS142 forthe reductionofChlorineTasteand
Odour and Nornina[ Particulate Class [to a capacity of 2,838 Litres (750 gallons).
Loading ...
Loading ...
Loading ...