Weil-McLain Eco tec 110-h Residential Boilers

User Manual - Page 9

For ECO TEC 110-H.

PDF File Manual, 156 pages, Read Online | Download pdf file

ECO TEC 110-H photo
Loading ...
Loading ...
Loading ...
Part number 550-100-260/0520
9
ECO
®
Tec
GAS-FIRED WATER BOILER80/110/150/199 BOILER MANUAL
Flooring and foundation
(฀฀฀)
Flooring
With the optional floor standing pedestal kit, the boiler is
approved for installation on combustible flooring, but must never
be installed on carpeting.
Do not install boiler on carpeting even if foundation
is used. Fire can result, causing severe personal
injury, death or substantial property damage.
Foundation
1. Provide a solid foundation pad, at least 2 inches above the
floor, if any of the following is true:
฀floor can become flooded,
฀the floor is dirt, sand, gravel or other loose material,
฀the boiler mounting area is severely uneven or sloped.
2. The minimum foundation size is:
 ECO
Tec: 20 inches wide x 20 inches deep.
3. Foundation may be of wood, brick or concrete (minimum 2
inches thick) construction.
If flooding is possible, elevate boiler sufficiently to prevent
water from reaching boiler.
Remove boiler from crate
฀฀฀. Use caution not to drop
the boiler or cause bodily injury while lifting
and handling. Verify that the boiler is securely
attached to prevent possibility of boiler falling after
installation.
After the boiler is removed from the shipping
carton, ฀ allow the boiler to sit on its
bottom. This would cause pressure on protruding
plastic, resulting in interior damage. Either lay
the boiler on its back or leave on the styrofoam
protective shipping base.
Do not drop boiler or bump jacket on floor or pallet.
Damage to boiler can result.
Cold weather handling — If boiler has been
stored in a very cold location (below 0°F) before
installation, handle with care until the plastic
components come to room temperature.
1. The ECO
Tec boiler is generally easier to handle and
maneuver after removing the shipping container.
2. Remove Items 1, 2, 3, 4, and 6 in Figure 3. Remove trim kit
and parts from Item 4.
3. ฀฀฀฀฀฀฀฀
 (Item 7) and bottom cardboard cap (Item 8), until
ready to place on the wall. If removing the boiler from the
shipping base, rest the boiler on its back, NOT on its bottom.
Failure to comply with the procedure given could
result in severe personal injury, death or substantial
property damage.
฀Cardboard cap, top
฀Cardboard angles
฀Pad
฀Styrofoam protective cap
฀Boiler
฀Cardboard sleeve
฀Styrofoam protective base
฀Cardboard cap, bottom
Prepare boiler location
฀ Boiler shipping container
ECO Tec
Boiler
Model
Heating Only Combi
Without
Pedestal
lbs.
With
Pedestal
lbs.
Without
Pedestal
lbs.
With
Pedestal
lbs.
80/110 141 163 152 174
150 162 184 172 194
199 178 200 187 209
฀ Boiler operating weights
Loading ...
Loading ...
Loading ...