Weil-McLain Eco tec 110-h Residential Boilers

User Manual - Page 56

For ECO TEC 110-H.

PDF File Manual, 156 pages, Read Online | Download pdf file

ECO TEC 110-H photo
Loading ...
Loading ...
Loading ...
฀ Prepare condensate drain line assembly
Part number 550-100-260/0520
56
ECO
®
Tec
GAS-FIRED WATER BOILER80/110/150/199 BOILER MANUAL
The condensate trap, hose clamp, and
condensate drain line must be in place during
all operation. Make sure condensate trap
is securely attached to the condensate tube
outlet and that the condensate drain line
is securely attached to the condensate trap
outlet. Ensure all components are in good
conditioned and installed per this manual.
Failure to comply could result in server
personal injury, death or substantial property
damage
Prepare condensate drain line assembly
1. Remove the condensate trap kit from the bag assembly.
2. Remove the fl exile drain nut (Item 2) and tube gasket ring (Item
3) from the trap kit bag assembly.
3. Slide nut (Item 2) onto end of exible tube (Item 1).
4. Push the fl exible tube gasket ring (Item 3) onto the end of the
exible tube (Item 1) as shown in Figure 66 . The tube should
extend through the gasket about ¼ inch.
5. Insert the fl exible tube and gasket into the drain fi tting. When in
position, the offset edge of the gasket ring will rest on the shoulder
of the drain fi tting as shown in Figure 66 , detail 4.
6. Secure the fl exible tube in place by screwing on the nut, Item 2.
Finger tighten securely.
Install the condensate trap assembly
1. Remove pedestal front access panel (if installed as a fl oor standing
boiler), see Figure 67 .
2. Slide hose clamp onto condensate outlet tube and hold in place.
3. Slide the trap assembly into the boiler condensate outlet tube.
Tighten the hose clamp to secure the condensate trap in place.
4. If oor standing boiler, route hose through slot in side of boiler
pedestal.
Condensate drain system
1. ฀฀฀฀฀฀฀฀฀
฀฀฀฀฀฀฀฀฀฀฀
฀฀฀฀฀
. The fl exible drain line will
t in a ¾" PVC coupling. Run minimum ½" PVC for the piping
to drain or condensate pump.
Use materials approved by the authority having
jurisdiction. In the absence of other authority, PVC and
CPVC pipe must comply with ASTM D1785, F441 or
D2665. Cement and primer must comply with ASTM
D2564 or F493. For Canada, use CSA or ULC certifi ed
PVC or CPVC pipe, fi ttings and cement.
2. Select a condensate pump (if used) that is approved for use with
condensing boilers and furnaces. The pump should have an
overfl ow switch to prevent property damage from condensate
spillage. The pump should have a minimum capacity of 2 GPH
for the ECO
Tec 80, 3 GPH for the ECO
Tec 110, 4 GPH for
the ECO
Tec 150 or 5 GPH for ECO
Tec 199.
3. When sizing condensate pumps, make sure to include the total
load of all appliances connected to it.
The condensate line must remain unobstructed,
allowing free fl ow of condensate. If condensate is
allowed to freeze in the line or if the line is obstructed
in any other manor, condensate can exit from the boiler
tee, resulting in potential water damage to property.
Condensate from the boiler will be slightly acidic
(typically with a pH from 3.2 to 4.5). Install a
neutralizing fi lter when draining into metal pipe and if
required by local codes. See Replacement parts section
at the end of this manual for the Weil-McLain kit.
Install condensate drain line & trap assembly
Slide Trap up into
Tube and secure by
tightening hose clamp
฀
Condensate outlet tube and condensate trap
connection (front access panel
removed)
Loading ...
Loading ...
Loading ...