Loading ...
Loading ...
Loading ...
4656” (1172 mm)
(1/2” Drywall)
or
46” (1168 mm)
(5/8” Drywall)
23” (584 mm)
(1/2” Drywall)
or Adjustable to
226M” (578 mm)
(5/8” Drywall)
486QE”
(1224 mm)
466” (1184 mm)
7”
(178 mm)
Min.
8556QE”
(221 mm) Min,
The Vermont Castings Group Model BPWC500
mantel is specially designed to comply with all mantel
temperature requirements. Any custom-built mantels must
comply with the framing clearances and the use of non-
combustibles as shown in Figures 5, 6 and 7.
10
20302381
Designer Series Direct Vent Gas Fireplace
Remove box and
Insulation for Top
Vent Congurations
Fold Outer Tabs
and Nail to Framing
Members
Figure 7 -
PFDV (Peninsula) Framing
If using 5/8" drywall, remove
framing tabs and re-install
on 2nd set of holes
positioned slightly inwards
The replace must be secured to the oor and/or to framing
studs as shown in Figure 7 . Use four (4) wood screws or
masonry/ concrete screws to secure replace to the oor.
Use four (4) screws to attach replace to framing. The side
brackets or nailing anges are designed to accommodate
two wall boards thicknesses, 1/2" or 5/8".
Figures 5, 6, 7
If using 5/8" drywall, remove
noncombustible supports,
rotate 180° and reinstall to
achieve 5/8" depth
Loading ...
Loading ...
Loading ...