Loading ...
Loading ...
Loading ...
8
2. Mark with a pencil the hole locations for screws and duct on
the ceiling.
3. Drill 6 holes on the ceiling Ø10 mm, insert 6 plugs
(Ø10x60 mm) and 4 screws (Ø6x60 mm) as shown in gure.
Pay attention that the screws and plugs must be suitable for
the type of wall.
4. Remove the sticker from the electrical system box as shown
in gure and follow steps 1-2-3.
5. Adjust the height of the structure by referring to the
indications shown in gure.
X
Y
49 mm
60 mm
maximum 1030 mm
minimum 815 mm
6. Fasten the exible pipe and tighten it with a clamp (not
supplied) in the air outlet bracket of the product as shown in
gure.
Ø150 mm
7. Take the structure and x it on the 4 screws and tighten.
Take the two safety screws Ø6x70 mm and x it permanently
to the ceiling, follow steps 1-2-3-4 indicated in gure.
Ø6x70 mm
Loading ...
Loading ...
Loading ...