Loading ...
Loading ...
Loading ...
11
7. Connect green (or bare) ground wire from home power supply
to yellow-green ground wire (F) in terminal box using UL listed
wire connectors.
8. Tighten strain relief screw.
9. Install terminal box cover.
10. Check that all light bulbs are secure in their sockets.
11. Reconnect power.
Optional Power Cord Kit Installations
For optional power cord kit installations, follow the instructions
supplied with the power cord kit. See the “Assistance or Service”
section for information on ordering.
NOTE: Use only with hood cord connection kits that have been
investigated and found acceptable for use with this model hood.
Install Duct Covers
NOTE: Remove the lm from the duct covers.
1. Assemble the upper duct covers together, and then install the
duct covers around the support frame. The larger hole in the
anges of the upper duct cover must be outside the smaller
hole in the mating ange of the other upper duct cover.
2. Take the upper tubes and t them on the slot of the structure
and x them with two screws Ø3.5x9.5 mm phases 1-2-3 in
the gure and x them denitively with 8 screws ØM4x7 mm
step 4 in the gure.
ØM4x7 mm
Ø3.5x9.5 mm
3. Take the lower tubes coupled and secure them with 6 screws
ØM4x7 mm as indicated in gure, step 1-2.
ØM4x7 mm
4. Take the 2 external panels and t them onto the slots of the
lower chimney, gure, step 1.Take the other 2 external panels
and check the height of the seat and if necessary cut off the
excess, remove the protection and press them onto the upper
pipes as indicated in gure, step 3-4.
CLACK !
Loading ...
Loading ...
Loading ...