GE AZ61H12EABW2 Zoneline® Deluxe Series Heat Pump Unit, 265 Volt

Owner's Manual and Installation Instructions - Page 13

For AZ61H12EABW2. Series: Zoneline® Deluxe Series

PDF File Manual, 120 pages, Read Online | Download pdf file

AZ61H12EABW2 photo
Loading ...
Loading ...
Loading ...
Installation Instructions
230/208 VOLT ELECTRICAL CONNECTION OPTIONS
HOW TO CONNECT
1. Remove the room cabinet.
2. Connect to electrical power.
3. Review the following steps for applicable supply
voltages.
4. Reinstall the room cabinet.
POWER CORD
CONNECTION
A power supply kit with LCDImust be used to supply power
to the Zoneline unit, The appropriate kit is determined by
the voltage, the means of electrical connection and
the amperage of the branch circuit,
Power supply kit
Connections of 208 or 230-volt circuits may be with a
power supply kit or a junction box kit.
All wiring, including installation of the receptacle, must
be in accordance with the NEC and local codes,
ordinances and regulations. Codes require the use of
an arc fault or leakage current detection device on the
power cord except direct connect. Be sure to select the
correct cord for your installation.
Tandem Perpendicular
15Amp. 20 Amp.
Large Tandem
30 Amp.
230/208-v01treceptacleconfiguration.
Branch Circuit and Proper GE Power Cord
Unit Amperage Rating with LCDI Device
15 RAK3153A
20 RAK3203A
30 RAK3303*
*Not approved for use on 7000 BTU models.
Power cords may include an arc fault interruption
or a leakage current detection interruption device.
A test and reset button is provided on the plug case
or the inline case. The device should be tested on
a periodic basis by first pressing the TEST button
and then the RESET button. If the TEST button does
not trip or if the RESET button will not stay engaged,
discontinue use of the Zoneline and contact a
qualified service technician.
ELECTRICALSUBBASE
CONNECTION
230/208-volt models may be installed using one
of the following electrical subbases:
Branch Circuit and Proper GE
Unit Amperage Rating Subbase Kit
15 RAK204D15P
20 RAK204D20P
30 RAK204D3OP*
_Notapprovedfor useon 7000BTUmodels,
Electrical subbases provide an enclosure for direct
connection or enclosed receptacles. The subbase kit
includes the power cord.
The instructions provided with the selected subbase kit
must be carefully followed. It is the responsibility of the
installer to ensure the connection of components is done
in accordance with these instructions and all electrical
codes.
13
DIRECTCONNECTION
Order the following Kit for 230/208-volt direct
connection as required:
Branch Circuit and Power Supply Power
Unit Amperage Rating Accessory Supply Kit
15 RAK4OO2A RAK4157
20 RAK4OO2A RAK4207
30 RAK4OO2A RAK4307*
_Not approved for use on 7000 BTU models.
Skip to the "MAKE ELECTRICALCONNECTION TO THE UNIT"
section.
Loading ...
Loading ...
Loading ...