Zephyr AK8800AS

User Manual - Page 12

For AK8800AS.

PDF File Manual, 18 pages, Read Online | Download pdf file

AK8800AS photo
Loading ...
Loading ...
Loading ...
10
www.zephyronline.com
Installation – Installing the Power Pack
Remove support screw from top of Power Pack
before installing into cabinet. FIG 2b
1. Place8”roundadapterontopofpowerpackandsecurewith(4)
M4x8screws.(FIG3)
2. Install optional AK088xxS Stainless Steel Liner under custom hood
opening. Review manual included with liner for more details.
3. If no liner is used cut out an opening in the bottom of the cabinet by
followingthedimensionsin(FIG1).
5. Lift Power Pack into opening and secure to bottom of cabinet using
(4)M4stainlesssteelscrews,(1)ineachcorner;see(FIG2).
NOTE: Wood blocking may need to be added to cabinet base if
additional support is needed.
6. Install 8” round duct work and seal with duct tape. Depending on
the contruction of the custom hood, the duct work may need to be
installed on top of the Power Pack prior to mounting the Power Pack
inside your custom hood.
7. Install electrical.
8. Remove all packing materials before using Power Pack.
Switch power on and check for leaks around duct tape.
CAUTION: At least two installers ar
e
required
due to the weight and size of
the
hood.
!
Front View
Ductwork
minimum
3/4” wood base
elec.
metal or other non
combustible material
(4) M4 ss wood screws
(1) in each corner
F
ront Vie
w
D
uctwor
k
m
i
n
i
m
u
m
3
/4” wood base
l
.
cabinet bottom cut-out size
26 1/16”
AK8800Ax
14 3/4
FIG 1
FIG 2
FIG 2b
remove support screw
C/L
C/L
FIG 3
Loading ...
Loading ...
Loading ...