Weil-McLain AQUABALANCE COMBI AB-120C Series 2 High-efficiency Gas Water Boiler

User Manual - Page 48

For AQUABALANCE COMBI AB-120C.

PDF File Manual, 136 pages, Read Online | Download pdf file

AQUABALANCE COMBI AB-120C photo
Loading ...
Loading ...
Loading ...
Part number 550-100-325/0419
48
AquaBalance
®
Series 2 Wall Mount Gas-fired Water Boiler Boiler Manual
19 Multiple boiler installations (continued)
Figure 59 

DHW tank piping with multiple
boilers
DHW direct connection—single tank
1. If BTUH output of a single boiler is sufficient for the
DHW tank/demand, pipe the indirect water heater to
the last boiler in the firing sequence. This will allow the
previous boilers to continue space heating while the last
boiler delivers DHW priority.
2. Pipe from the near-boiler piping to the DHW tank’s
boiler connections as shown in Figure 54, page 43.
3. Connect the DHW tank aquastat directly to the DHW
input on the last boiler in the sequence.
When using a multiple-boiler control with lead boiler
rotation, it is recommended that the boiler connected to
the DHW tank is always set as the last boiler to operate
in the sequence so that space heat can be maintained
during times of DHW demand.
DHW tanks as zone—multiple tanks
1. If using multiple DHW tanks or multiple banks of tanks, pipe the
tanks to the primary system loop with a secondary connection as
shown in Figure 59.
2. DHW tanks are zoned with circulators as shown.
3. If DHW priority is required, use separate zone controllers for
DHW and space heating.
Loading ...
Loading ...
Loading ...