Weil-McLain AQUABALANCE COMBI AB-120C Series 2 High-efficiency Gas Water Boiler

User Manual - Page 23

For AQUABALANCE COMBI AB-120C.

PDF File Manual, 136 pages, Read Online | Download pdf file

AQUABALANCE COMBI AB-120C photo
Loading ...
Loading ...
Loading ...
Part number 550-100-325/0419
23
AquaBalance
®
Series 2 Wall Mount Gas-fired Water Boiler Boiler Manual
11 DIRECT VENT — Sidewall concentric
Allowable vent/air pipe materials
& lengths
1. The concentric termination kit must be purchased
separately.
Use only the vent materials and kits listed in
Figure 21, page 17. Provide pipe adapters if
specified.
2. Locate the termination such that the total air pip-
ing and vent piping from the boiler to the termina-
tion will not exceed the maximum length given in
Figure 20, page 16.
3. This termination requires a 45-degree elbow that is
not supplied with the termination kit. The maximum
vent/air pipe lengths include allowance for this elbow.
For polypropylene applications, comply
with any additional requirements in the
vent system manufacturer’s instructions.
(Do Not use 3” PVC transition pieces at the
boiler vent and air connections)
and at the
termination if using a 3” PVC concentric
vent kit. Install a locking collar at every joint.
For AL29-4C vent pipe applications, comply
with any additional requirements in the vent
system manufacturer’s instructions.
Provide
a AL29-4C starter piece from the AL29-4C
manufacturer to the
transition at the boiler
vent connection. Air pipe must be PVC or
CPVC. Provide a 3” PVC transition at the
boiler air connection if using 2” air pipe.
Provide transition pieces to PVC at the vent
and air pipe termination connections.
Wall penetration thickness between 2” to
24”.
฀฀
1. The concentric termination kit must be installed as
shown in Figure 29, page 24.
2. The termination must comply with clearances and
limitations shown in Figure 22, page 19.
3. Locate the termination so it is not likely to be damaged
by foreign objects, such as stones or balls, or subject
to buildup of leaves or sediment.
฀฀
1. When terminating multiple boilers, install each con-
centric termination as described in this manual.
All vent pipes and air inlets must terminate
at the same height to avoid possibility of
severe personal injury, death or substantial
property damage.
2. Place wall penetrations to obtain minimum clear-
ance as shown in Figure 28, page 24 for U. S. installa-
tions.
For Canadian installations, provide clearances
required by CSA B149.1 or B149.2 Installation Code
and a ULC S636 compliant vent kit.
3. The air inlet of a boiler is part of a direct vent con-
nection. It is not classified as a forced air intake with
regard to spacing from adjacent boiler vents.
Figure 27 ฀
฀฀Read and follow all instructions in this manual. ฀฀฀
฀฀฀฀฀฀฀฀฀
฀฀฀฀฀
See notices at left.
฀฀Install the boiler in a location that allows proper routing of all vent
and air piping to the selected sidewall location.
฀฀Make sure the selected sidewall termination location complies with
Figure 22, page 19. (Multiple boiler concentric terminations must
also comply with
Figure 28, page 24
.)
฀฀Use only the vent materials listed in Figure 21, page 17. Provide pipe
adapters where required.
฀฀Vent piping and air piping lengths must not exceed the values shown
in Figure 20, page 16.
฀฀The concentric termination must be assembled and installed before
piping from the boiler to the termination.
฀฀Prepare the sidewall penetration — assemble the concentric ter-
mination kit and secure the cover plates as instructed in this sec-
tion. Provide the supports indicated and mount the termination
assembly. See “Install termination — concentric pipes” on page 24.
See notices at left.
฀฀Install vent and air piping between the boiler and the concentric
vent/air termination. Slope horizontal piping downward toward the
boiler at least 1/4 inch per foot. See page 32 for general guidelines.
฀฀Install pipe supports every 5 feet on both the horizontal and vertical
runs.
See notices at left.
฀฀Install a hanger support within 6 inches of any upturn in the piping.
See notices at left.
฀฀฀฀฀฀฀฀
 — DO NOT use short radius elbows for vent or
air piping. Boiler performance could be affected.
Loading ...
Loading ...
Loading ...